Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Empirical Estimates of Transmission Value using Locational Marginal Prices [Slides]

This study focuses on one potential benefit of transmission infrastructure—congestion relief. It explores historical grid conditions from 2012 through the first half of 2022, and evaluates the marginal value of transmission in facilitating trade within and across regional boundaries by calculating differences in observed nodal wholesale power prices. The study finds that wholesale power prices exhibit stark geographic differences that, in many cases, are stable over time. Many regional and interregional transmission links have significant potential economic value from reducing congestion and expanding opportunities for trade. In fact, many links have hourly average pricing differences in 2021 that exceeded $\$15$/MWh—equivalent to $130 million per year for a 1000 MW link. The value of transmission is correlated with overall energy prices and varies by region and year. Critically, extreme conditions and high-value periods play an outsized role in the value of transmission, with 50% of transmission’s congestion value coming from only 5% of hours. Transmission planners run the risk of understating the benefits of regional and interregional transmission if extreme conditions and high-value periods are not adequately considered. These periods are natural features of actual market operations. As such, the study highlights the need for planners to more-comprehensively assess the value of transmission under both normal and extreme conditions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Batteries Included: Top 10 Findings from Berkeley Lab Research on the Growth of Hybrid Power Plants in the United States

One of the most important electric power system trends of the 2010s was the rapid deployment of wind turbines and photovoltaic arrays, but a twist for the 2020s may be the rapid deployment of ‘hybrid’ generation resources. Hybrid power plants typically combine solar or wind (or other energy sources) with co-located storage. While hybridization helps to ease the challenge of balancing variable supply and demand, its relative novelty means that research is needed to facilitate integration and promote innovation. Combining the characteristics of multiple energy, storage, and conversion technologies poses complex questions for grid operations and economics. Project developers, system operators, planners, and regulators would benefit from better data, methods, and tools to estimate the costs, values, and system impacts of hybrid projects. This publication showcases some of Berkeley Lab’s robust research program intended to support private- and public-sector decision-making about hybrid plants in the United States. Our short briefing summarizes articles that we published between 2020 and 2022, links to the in-depth reports, and provides contact details for further engagement on the specific research topics: Growth: Developer interest in hybrid power plants is strong and growing Price vs. Value: PV+storage hybrids have low PPA prices and high value in some regions Market Drivers: Solar hybridization is driven by tax credits and other benefits Configuration Choices: Market prices have incentivized shorter duration batteries with PV Capacity Value: The capacity contribution of a hybrid is less than the sum of its parts Ancillary Services: AS markets are a valuable yet fleeting option for hybrids Market Participation: Hybrids can more flexibly engage with electricity markets Operations: The power system value of hybrids depends on how they are operated Distributed Hybrids: Growth of customer-sited PV+storage hybrids offers new opportunities Future Research: Where next? Priority areas for hybrid power research.

25 ENERGY STORAGE↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Variable Renewable Energy Participation in U.S. Ancillary Services Markets: Economic Evaluation and Key Issues

Variable renewable energy (VRE) is not yet meaningfully participating in U.S. ancillary services (AS) markets. VRE participation in AS markets could provide a new source of revenues for VRE resource owners to offset declining energy and capacity values and a new tool for power system operators to address emerging system constraints. This paper uses a price-taker dispatch model and historical prices to estimate the economic value of standalone and hybrid (battery-paired) VRE participation in AS markets, from resource owner and electricity system perspectives, in each of the seven U.S. independent system operator and regional transmission organization (ISO/RTO) markets. Across ISO/RTO markets, average (2015-2019) simulated incremental revenues from regulation market participation were $\$$0.0-2.9/MWh (+0-15% of revenue without participation) for standalone VRE owners and $\$$1-33/MWh (+1-69%) for hybrid VRE owners. However, ISO/RTO reserve markets are relatively thin and have the potential to become saturated by energy storage projects that are currently in ISO/RTO interconnection queues. In most markets, standalone and hybrid VRE were able to provide regulation reserves during periods with high regulation prices, suggesting that VRE participation in AS markets could have high system value. The analysis highlights the value of separate upward and downward regulation products and suggests that ISOs/RTOs might consider initially focusing on enabling hybrid VRE provision of AS.

14 SOLAR ENERGY↗

Land-Based Wind Market Report: 2021 Edition

The U.S. Department of Energy's 2021 edition of its land-based wind market report provides an overview of key trends in the U.S. wind power market, with a focus on 2020. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Highlights of this year’s update include: -Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a record pace in 2020, with 25 billion dollars invested in 16.8 GW of capacity. Wind energy output rose to account for more than 8% of the entire nation’s electricity supply, and is more than 20% in 10 states. At least 209 GW of wind are seeking transmission interconnection; 61 GW of this capacity are offshore wind and 13 GW are hybrid plants that pair wind with storage or PV. -Wind project performance has increased over time: The average capacity factor among recently built projects was over 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. -Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2010, no turbines employed blades that were 115 meters in diameter or larger, but in 2020, 91% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. -Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices are averaging 775–850 dollars/kW. The average installed cost of wind projects in 2020 was 1,460 dollars/kW, down more than 40% since the peak in 2010, though stable for the last three years. The lowest costs were found in Texas and the (non-ISO) West. -Wind energy prices remain low, around 20 dollars/MWh in the interior of the country: After topping out at 70 dollars/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped. In the interior ‘wind belt’ of the country, recent pricing is around 20 dollars/MWh. In the West and East, prices tend to average 30 dollars/MWh or more. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. -Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind declined in 2020, following natural gas prices lower and averaging under 15 dolalrs/MWh in ERCOT, MISO, NYISO and SPP; higher values were seen in CAISO, ISO-NE and PJM. -The average levelized cost of wind energy is down to 33 dollars/MWh: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography, but the national average stood at 33 dollars/MWh in 2020—down substantially historically, though consistent with the previous two years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. -The health and climate benefits of wind in 2020 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of 76 dollars/MWh-wind nationwide in 2020. -The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>85%), towers (60-75%), and blades and hubs (30-50%), but is much lower for most components internal to the nacelle.

17 WIND ENERGY↗

Hybrid Power Plants: Status of Installed and Proposed Projects [Slides]

As battery prices fall and wind and solar generation rises, power plant developers are increasingly combining wind and solar projects with on-site batteries, creating “hybrid” power plants. But hybrid or co-located plants have been part of the U.S. electricity mix for decades, with widely ranging configurations that extend beyond pairing a generator with a battery. This new summary tracks and maps existing hybrid and co-located plants across the United States while also synthesizing data from generation interconnection queues to illustrate developer interest in the next wave of plants. The scope is inclusive of co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and also full hybrids that feature co-location and co-control. The focus is on larger, 1 MW+ systems: smaller (often behind-the-meter) projects are also increasingly common, but are not included in the data synthesis. Based in part on EIA Form 860 data, there were at least 125 co-located hybrid plants (>1 MW) already operating across the United States at the end of 2019, totaling over 14 GW of aggregate capacity. Some of the most common configurations include wind+storage (13 projects, 1,290 MW wind, 184 MW storage), PV+storage (40 projects, 882 MW PV, 169 MW storage), and fossil+storage (10 projects, 2,414 MW fossil, 91 MW storage). Data from interconnection queues demonstrates the considerable commercial interest that exists in hybrid power plants, especially solar co-located with storage. By the end of 2019, there were at least 367 GW of solar plants in the nation’s queues; 102 GW (~28%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage. For wind, 225 GW of capacity sat in the queues, with 11 GW (~5%) proposed as a hybrid, again most-often pairing wind with storage. The proposed solar+storage plants are located throughout the United States, but with California and the non-ISO West being the most prominent areas of commercial interest. Proposed wind+storage and standalone storage plants also center to a degree on these regions of the country.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Are coupled renewable-battery power plants more valuable than independently sited installations?

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$$10/MWh across ISOs on average. The highest boost occurs in California ($\$$15/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$$12.5/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$$12.5/MWh coupling penalty is reduced to $\$$1.6/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$$2–$\$$13/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗

An Assessment of Evaluation Practices of Low- And Moderate-Income Solar Programs

As concerns about social equity and clean energy rise, state and local governments, utilities, and non-profit organizations are offering at least 41 active programs in 21 states to promote solar adoption as a way to reduce energy bills for low- and moderate-income (LMI) households while meeting other policy goals such as job creation and clean energy generation. A new study from Berkeley Lab looks at how those programs are being evaluated. The report provides background on how they seek to address LMI household energy burdens and gives a brief discussion of the art and science of program evaluation, drawn from decades of experience in energy efficiency programs. It then turns to how LMI solar programs are currently being evaluated, highlighting trends among evaluation methods, metrics tracked, and best practices employed. A few programs are explored in more depth to illustrate notable practices that could be applied to other program evaluations. These LMI solar programs are mostly young, operate on tight budgets, and vary considerably in their design and stated goals. Consequently, well-designed program evaluation is critical to better understand what works, what could be improved, and how to maximize program impacts under budget constraints.

14 SOLAR ENERGY↗

Halfway to Zero: Progress towards a Carbon-Free Power Sector

Sharply reducing carbon emissions is imperative to prevent the worst effects of climate change. Yet even in the power sector—often viewed as the lynchpin to economy-wide decarbonization, and where low-carbon solutions are increasingly plentiful and cost-effective—the pace and scale of the required transformation can be daunting. A review of historical trends, however, shows the progress the power sector has already made in reducing emissions. Fifteen years ago, many business-as-usual projections anticipated that annual carbon dioxide (CO 2 ) emissions from power supply in the United States would reach 3,000 million metric tons (MMT) in 2020. In fact, direct power-sector CO 2 emissions in 2020 were 1,450 MMT—roughly 50% below the earlier projections. By this metric, in only 15 years the country’s power sector has gone halfway to zero emissions. Other metrics also evolved differently than projected: total consumer electricity costs (i.e., bills) were 18% lower; costs to human health and the climate were 92% and 52% lower, respectively; and the number of jobs in electricity generation was 29% higher. Economic, technical, and policy factors contributed to this success, including sectoral changes, energy efficiency, wind and solar, continued operations of the nuclear fleet, and coal-to-gas fuel switching. This historical record demonstrates the ability of technological and policy changes to set the power sector on a dramatically different emissions trajectory. Past success, however, does not trivialize the challenges that remain for further decarbonization in the power sector and beyond. Nor does it offer a specific roadmap for how best to achieve additional power-sector emissions reductions. Numerous challenges confront a zero-emissions pathway, and future strategies will likely differ from those of the past. Many recent studies have assessed how to make further progress in decarbonizing the power sector on the pathway to decarbonizing the economy as a whole. We summarize the core results of those studies, but the primary goal of this report is to highlight the progress that has already been made in reducing power-sector emissions. As the country maps out a plan for further decarbonization, experience from the past 15 years offers two central lessons. First, policy and technology advancement are imperative to achieving significant emissions reductions. Second, our ability to predict the future is limited, and so it will be crucial to adapt as we gain policy experience and as technologies advance in unexpected ways.

54 ENVIRONMENTAL SCIENCES↗

Solar-to-Grid: Trends in System Impacts, Reliability, and Market Value in the United States with Data Through 2019

With continued deployment of solar across the United States, assessing the interactions of solar with the power system is an increasingly important complement to studies tracking the cost and performance of solar plants. This project focuses on the historical contribution to reliability, trends in market value, and impacts on the bulk power system of solar deployed in the U.S. through the end of 2019.

14 SOLAR ENERGY↗

Wind Technology Data and Trends: Land-Based Focus (Update 2020) [Slides]

The purpose of this presentation is to summarize publicly available data on key trends in U.S. wind power sector. In scope, the presentation focuses on land-based wind turbines over 100 kW in size, separates DOE-funded data collection efforts on distributed and offshore wind, and focuses on historical data, with some emphasis on the previous year.

17 WIND ENERGY↗

Impacts of High Variable Renewable Energy Futures on Electric-Sector Decision Making: Demand-Side Effects

Previous work by the Berkeley Lab describes how high shares of variable renewable energy (VRE) such as wind and solar power could change wholesale electricity price dynamics. These include the timing of when electricity is cheap or expensive, locational differences in the cost of electricity, and the degree of regularity or predictability in those costs. Many decentralized decision-makers on the demand-side may not yet have considered the implications of these possible future changes. In this report, we evaluate the sensitivity of a set of demand-side decisions to different levels of VRE penetration ranging from a low of 5-20% to a high of 40-50%. The analysis builds on hourly wholesale energy and capacity prices in different VRE scenarios for four wholesale markets in the United States for the year 2030 (CAISO, ERCOT, NYISO, and SPP). The principal question for this exploration is whether private and public electric-sector decisions that are made based on assumptions reflecting low VRE levels still achieve their intended objective in a high VRE scenario with 40-50% wind and solar? This scoping report evaluates the impacts of changing patterns of peak system needs on the benefits of demand reductions by examining the altered value of different energy efficiency (EE) measures. Similarly, we investigate new opportunities for large energy consumers that may arise from periods with very low wholesale electricity prices. We calculate the value of new process investments (e.g., hydrogen production and other generalized electro-commodities), showcase the varying value of new product storage investments (such as reservoir extensions at a desalination plant), and estimate the benefits of increased process flexibility that uses electricity as a process-input in addition to traditional fossil fuels (e.g., district energy systems). Finally, many decentralized decision-makers and end-use customers are not directly exposed to wholesale electricity prices but instead receive price signals from their retail electricity rates. As wind and solar shares increase, we compare the economic efficiency of flat retail rates relative to more dynamic time-of-use tariffs with and without critical peak-pricing events.

14 SOLAR ENERGY↗

Benchmarking Utility-Scale PV Operational Expenses and Project Lifetimes: Results from a Survey of U.S. Solar Industry Professionals

This paper draws on a survey of solar industry professionals and other sources to clarify trends in the expected useful life and operational expenditure (OpEx) of utility-scale photovoltaic (PV) plants in the United States. Solar project developers, sponsors, long-term owners, and consultants have increased project-life assumptions over time, from an average of ~21.5 years in 2007 to ~32.5 years in 2019. Current assumptions range from 25 years to more than 35 years depending on the organization; 17 out of 19 organizations surveyed or reviewed use 30 years or more. Levelized, lifetime OpEx estimates have declined from an average of ~$\$$35/kW DC -yr for projects built in 2007 to an average of ~$\$$17/kW DC -yr in 2019. Across 13 sources, the range in average lifetime OpEx for projects built in 2019 is broad, from $\$$13 to $\$$25/kW DC -yr. Operations and maintenance (O&M) costs—one component of OpEx—have declined precipitously in recent years, to $\$$5-8/kW DC -yr in many cases. Property taxes and land lease costs are highly variable across sites, but on average are—together—of similar magnitude. Other OpEx line items include security, insurance, and asset management. Given 2007-2009 values for not only project life and OpEx but also other drivers of the levelized cost of energy (LCOE, excluding the investment tax credit), the LCOE for utility-scale PV projects built from 2007 through 2009 averaged $\$$305 /MWh. Using 2019 values for all parameters yields an average LCOE of $\$$51 /MWh. The decline in LCOE from $\$$305 /MWh to $\$$51 /MWh was predominantly caused by reductions in up-front expenditures (and, to a much lesser extent, by changes in capacity factors, financing costs, and tax rates), but 9% ($\$$22 /MWh) of the overall decline is due to improvements in project life and OpEx. Project life extensions and OpEx reductions have had similarly sized impacts on LCOE over this period, at $\$$11 /MWh each. Had project life and OpEx not improved over the last decade, LCOE in 2019 would have instead been $\$$73 /MWh—43% higher. Given the limited quantity and comparability of previously available data on these cost drivers, the data and trends presented here may inform assumptions used by electric system planners, modelers, and analysts. The results may also provide useful benchmarks to the solar industry, helping developers and assets owners compare their expectations for project life and OpEx with those of their peers.

14 SOLAR ENERGY↗