Search NASASearch

Engineering topics

Witkowski, Mona

Publications and source records attributed to Witkowski, Mona.

CloudSat Anomaly Recovery and Operational Lessons Learned

In April 2011, NASA's pioneering cloud profiling radar satellite, CloudSat, experienced a battery anomaly that placed it into emergency mode and rendered it operations incapable. All initial attempts to recover the spacecraft failed as the resultant power limitations could not support even the lowest power mode. Originally part of a six-satellite constellation known as the "A-Train", CloudSat was unable to stay within its assigned control box, posing a threat to other A-Train satellites. CloudSat needed to exit the constellation, but with the tenuous power profile, conducting maneuvers was very risky. The team was able to execute a complex sequence of operations which recovered control, conducted an orbit lower maneuver, and returned the satellite to safe mode, within one 65 minute sunlit period. During the course of the anomaly recovery, the team developed several bold, innovative operational strategies. Details of the investigation into the root-cause and the multiple approaches to revive CloudSat are examined. Satellite communication and commanding during the anomaly are presented. A radical new system of "Daylight Only Operations" (DO-OP) was developed, which cycles the payload and subsystem components off in tune with earth eclipse entry and exit in order to maintain positive power and thermal profiles. The scientific methodology and operational results behind the graduated testing and ramp-up to DO-OP are analyzed. In November 2011, the CloudSat team successfully restored the vehicle to consistent operational collection of cloud radar data during sunlit portions of the orbit. Lessons learned throughout the six-month return-to-operations recovery effort are discussed and offered for application to other R&D satellites, in the context of on-orbit anomaly resolution efforts.

cloud profiling radar satellite

CloudSat Anomaly Recovery and Operational Lessons Learned

Nov 2011: NASA/JPL declared CloudSat fully operational in DO ]OP Mode . CloudSat collects science data during sunlit portion of orbit, stable spin hibernation in eclipse . New CONOPS requires constant monitoring of thermal and power profiles, while allowing collection of 54 mins of science data per sunlit orbit

spacecraft systems

Mission Operations and Command Assurance: Automating an Operations TQM Task

Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality into mission operations. The mission operations environment is inherently risky because each decision made is potentially mission critical. The flight operations environment generally requires operators to make rapid critical decisions and solve problems based on limited information, while closely following standard procedures. MO&CA's primary goal is to help improve the operational reliability and reduce risk of projects during flight. To achieve this goal, automation of the MO&CA task is required. MO&CA specifically embodies the TQM principle of continuous process improvement (CPI) in which processes are continually examined and analyzed for opportunities for improvement. The second way in which MO&CA implements CPI on JPL projects is on new projects or upgrades to existing projects.

mission

Mission Operations and Command Assurance: Automating an Operations TQM Task

A long-term program is in progress at JPL to reduce cost and risk of mission operations through defect prevention and error management. A major element of this program, Mission Operations and Command Assurance (MO&QA), provides a system level function on flight projects to instill quality in mission operations. MO&CA embodies the Total Quality Management (TQM) principle of Continuous Process Inprovement (CPI) and uses CPI in applying automation to mission operations to reduce risk and costs. MO&CA has led efforts to apply and has implemented automation in areas that impact the daily flight project environment including Incident Surprise Anomoly tracking and reporting; command data verification, tracking, and reporting; and command support data usage. MO&CA's future work in automation will take into account that future missions systems must be designed to avoid increasing error through the introduction of automation, while adapting to the demands of smaller flight teams.

automation

Mission operations and command assurance - Automating an operations TQM task

A long-term program is in progress at JPL to reduce cost and risk of mission operations through defect prevention and error management. A major element of this program, Mission Operations and Command Assurance (MO&CA), provides a system level function on flight projects to instill quality in mission operations. MO&CA embodies the total quality management TQM principle of continuous process improvement (CPI) and uses CPI in applying automation to mission operations to reduce risk and costs. MO&CA has led efforts to apply and has implemented automation in areas that impact the daily flight project work environment including Incident Surprise Anomaly tracking and reporting; command data verification, tracking and reporting; and command support data usage. MO&CA's future work in automation will take into account that future mission operations systems must be designed to avoid increasing error through the introduction of automation, while adapting to the demands of smaller flight teams.

Welz, Linda