Onboard Automated Scheduling for the Mars 2020 Rover

The Mars 2020 Mission, scheduled to land on Mars February 18, 2021, has developed an onboard scheduling system [1]. The rationale for the onboard scheduler is to enable the Perseverance rover to adjust its activities in response to activities taking longer or shorter than planned, or using more or less resources than expected, as effectively using these resources could significantly improve rover productivity [2]. If deployed, the onboard scheduler would be an unprecedented use of Artificial Intelligence/Autonomy onboard software in a key role for a major mission.

Biehl, J.

Interface standardization

Central-station applications create a large and attractive market for photovoltaics in the near future. However, some significant barriers lie between the industry of today and realization of that market. Manufacturing capacity and price are two principal impediments. The Utilities, which are the future system owners, are gaining experience with central-station PV power through the Sacramento Municipal Utility District, Hesperia and similar small central-station installations. SMUD has recognized that competition must be maintained to help reduce prices. So little standardization exists that the cost is driven upward to redefine mechanical and electrical interfaces for each vendor. New structues are required for each vendor and nonoptimum field geometries result from attempts to include more than one vendor in an array field. Standards at some hardware level are required.

Spencer, R.