ON-GOING STATUS OF KJRR FUEL (U-7MO) QUALIFICATION
In order to cope with global shortage of Mo-99 supplies and with growing demand of neutron transmutation doping, KJRR construction plan has been launched since April 2012 to provide self-sufficiency of domestic RI demand, and to extend Si doping capacity for power device market growth. Through comprehensive surveillance of the fuels in-reactor behavior, KAERI has selected the fuel meat of U-7%Mo dispersion in an aluminum matrix with 5wt%Si for the KJRR fuel. As part of the efforts for fuel licensing and qualification of the KJRR fuel, an LTA irradiation test at the ATR started from November 2015 was successfully completed by reaching at 219 EFPD in the end of February 2017. Together with the results of HAMP-1 already completed irradiation and PIE, the successful irradiation of the LTA also demonstrates the fuel integrity under more rigorous conditions than the KJRR operation conditions. This paper updates the current status of the KJRR U7Mo (8 g-U/cm3) LTA irradiation and PIE plan up to date as of February 2017.