Search NASASearch

Engineering topics

Wright, Michael R.

Publications and source records attributed to Wright, Michael R..

Flight Systems Integration & Test: Lessons Learned for Future Success

This paper offers a comprehensive view of flight system integration and test (I&T) lessons learned related to mishaps and close calls, focusing on what can be done to improve the I&T process to avoid recurrence. Specific areas within the realm of I&T that are covered in this paper include: I&T team communication and training; design of flight and ground systems for I&T; planning and scheduling; configuration management and process documentation; ground support equipment and tools; cleanrooms and contamination; mechanical integration, handling, and deployments; electrical integration and electrostatic discharge; functional testing and troubleshooting; environmental testing and facilities; and launch site operations. To illustrate "real-world" lessons learned for I&T, examples from throughout the history of the U.S. space program are presented. Also presented are some best practices for I&T that can help mitigate mishaps and close calls on the ground or during flight.

Integration & Test

Low-Latency Teleoperations: Operational Implications for Human Space Exploration

Low-latency teleoperations (LLT) is envisioned to be an element of human exploration missions in a number of different applications. LLT can be broadly considered to encompass any remote operation of an asset with a communication delay that is less than the human response time to allow for what is effectively "real-time" or "near real-time" operations. This paper will explore motivations and operational implications for why and how LLT might be used for human exploration space missions. LLT analyses have been performed under the auspices of the NASA Human Spaceflight Architecture Team (HAT) and Evolvable Mars Campaign (EMC). The EMC created a flexible, evolvable, capability-driven architectural strategy to enable a sustainable long-term human presence at Mars. LLT is envisioned to be part of that strategy for both in-space and on-surface applications, and this paper will expand on operational considerations within that broader strategic context, as well additional contexts. Some operational implications explored in this paper, derived largely from previous work, are: (1) crew mission support, for which we will address roles for Mission Control on earth, balanced with the capability for crew and robotic assets to operate independently, (2) science operations, with a focus on "backroom" support, highly dynamic science, and enhanced science return and efficiency, and (3) operational efficiency at a deep-space destination such as Mars, including implications for communications infrastructures and how to leverage and balance system autonomy with crew operations, both of which can inform the overall operational "choreography" between crew members, multiple shifts, and exploration assets.

human spaceflight

The Neutron Star Interior Composition Explorer (NICER): Design and Development

During 2014 and 2015, NASA's Neutron star Interior Composition Explorer (NICER) mission proceeded successfully through Phase C, Design and Development. An X-ray (0.2{12 keV) astrophysics payload destined for the International Space Station, NICER is manifested for launch in early 2017 on the Commercial Resupply Services SpaceX-11 flight. Its scientific objectives are to investigate the internal structure, dynamics, and energetics of neutron stars, the densest objects in the universe. During Phase C, flight components including optics, detectors, the optical bench, pointing actuators, electronics, and others were subjected to environmental testing and integrated to form the flight payload. A custom-built facility was used to co-align and integrate the X-ray \concentrator" optics and silicon-drift detectors. Ground calibration provided robust performance measures of the optical (at NASA's Goddard Space Flight Center) and detector (at the Massachusetts Institute of Technology) subsystems, while comprehensive functional tests prior to payload-level environmental testing met all instrument performance requirements. We describe here the implementation of NICER's major subsystems, summarize their performance and calibration, and outline the component-level testing that was successfully applied.

SEXTANT

Flight Systems Integration and Test

Topics to be Covered in this presentation are: (1) Integration and Test (I&T) Planning (2) Integration and Test Flows (3) Overview of Typical Mission I&T (4) Supporting Elements (5) Lessons-Learned and Helpful Hints (6) I&T Mishaps and Failures (7) The Lighter Side of I&T and (8) Small-Group Activity. This presentation highlights a typical NASA "in-house" I&T program (1) For flight systems that are developed by NASA at a space flight center (like GSFC) (2) Requirements well-defined: qualification/acceptance, documentation, configuration management. (3) Factors: precedents, human flight, risk-aversion ("failure-phobia"), taxpayer dollars, jobs and (4) Some differences among NASA centers, but generally a resource-intensive process

Wright, Michael R.

Lunar Atmosphere and Dust Environment Explorer Integration and Test

Integration and test (I&T) of the Lunar Atmosphere and Dust Environment Explorer (LADEE) is presented. A collaborative NASA project between Goddard Space Flight Center and Ames Research Center, LADEE's mission is to explore the low lunar orbit environment and exosphere for constituents. Its instruments include two spectrometers, a dust detector, and a laser communication technology demonstration. Although a relatively low-cost spacecraft, LADEE has I&T requirements typical of most planetary probes, such as prelaunch contamination control, sterilization, and instrument calibration. To lead to a successful mission, I&T at the spacecraft, instrument, and observatory level must include step-by-step and end-to-end functional, environmental, and performance testing. Due to its compressed development schedule, LADEE I&T planning requires adjusting test flows and sequences to account for long-lead critical-path items and limited spares. A protoflight test-level strategy is also baselined. However, the program benefits from having two independent but collaborative teams of engineers, managers, and technicians that have a wealth of flight project experience. This paper summarizes the LADEE I&T planning, flow, facilities, and probe-unique processes. Coordination of requirements and approaches to I&T when multiple organizations are involved is discussed. Also presented are cost-effective approaches to I&T that are transferable to most any spaceflight project I&T program.

Wright, Michael R.

Lunar Atmosphere and Dust Environment Explorer Integration and Test

The Lunar Atmosphere and Dust Environment Explorer (LADEE) is a NASA collaborative flight project to explore the lunar exosphere. It is being developed through a unique partnership between NASA's Ames Research Center (ARC) and Goddard Space Flight Center (GSFC). Each center brings its own experience and flight systems heritage to the task of integrating and testing the LADEE subsystems, instruments, and spacecraft. As an "in-house" flight project being implemented at low-cost and moderate risk, LADEE relies on single-string subsystems and protoflight hardware to accomplish its mission. Integration and test (l&T) of the LADEE spacecraft with the instruments will be performed at GSFC, and includes assembly, integration, functional testing, and flight qualification and acceptance testing. Due to the nature of the LADEE mission, l&T requirements include strict contamination control measures and instrument calibration procedures. Environmental testing will include electromagnetic compatibility (EMC), vibro-acoustic testing, and thermal-balance/vacuum. Upon successful completion of spacecraft l&T, LADEE will be launched from NASA's Wallops Flight Facility. Launch of the LADEE spacecraft is currently scheduled for December 2012.

Wright, Michael R.

A Lunar Electromagnetic Launch System for In-Situ Resource Utilization

Future human exploration of the moon will require the development of capabilities for in-situ resource utilization (ISRU). Transport of lunar-derived commodities such as fuel and oxygen to orbiting resource depots has been proposed to enable refueling landers or other vehicles. A lunar electromagnetic launch (LEML) system could be an effective means of transporting materials, as an alternative to non-renewable chemical-based propulsion systems. An example LEML concept is presented based on previous studies, existing EML technologies, and NASA's human exploration architecture. A preliminary assessment of the cost-versus-benefit of such a system is also offered; the conclusion, however, is not as favorable for LEML as originally suggested.

Wright, Michael R.

A National MagLev Transportation System

The case for a national high-speed magnetic-levitation (MagLev) transportation system is presented. Focus is on current issues facing the country, such as national security, the economy, transportation, technology, and the environment. NASA s research into MagLev technology for launch assist is also highlighted. Further, current socio-cultural norms regarding motor-vehicle-based transportation systems are questioned in light of the problems currently facing the U.S. The multidisciplinary benefits of a long-distance MagLev system support the idea that such a system would be an important element of a truly multimodal U.S. transportation infrastructure.

Wright, Michael R.

Integration and Test of Shuttle Small Payloads

Recommended approaches for space shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of shuttle small payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration and interface testing; (7) Postflight operations. This paper is of special interest to those payload projects that have small budgets and few resources: that is, the truly faster, cheaper, better projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

Wright, Michael R.

Integration and Test for Small Shuttle Payloads

Recommended approaches for shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of small shuttle payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of the NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration, and interface testing; and (7) Postflight operations. This paper is of special interest to those payload projects which have small budgets and few resources: That is, the truly 'faster, cheaper, better' projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

Wright, Michael R.

The Hitchhiker's Guide to I&T

With over two dozen missions since the first in 1986, the Hitchhiker project has a reputation for providing quick-reaction, low-cost flight services for Shuttle Small Payloads Project (SSPP) customers. Despite the successes, several potential improvements in customer payload integration and test (I&T) deserve consideration. This paper presents suggestions to Hitchhiker customers on how to help make the I&T process run smoother. Included are: customer requirements and interface definition, pre-integration test and evaluation, configuration management, I&T overview and planning, problem mitigation, and organizational communication. In this era of limited flight opportunities and new ISO-based requirements, issues such as these have become more important than ever.

Wright, Michael R.