Search NASA⌕ Search

Engineering topics

Wrzesinski, Wendell

Publications and source records attributed to Wrzesinski, Wendell.

One System Overview - 16579

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for managing and completing the River Protection Project mission, which is to 'safeguard the nuclear waste stored in Hanford's 177 underground tanks, and to manage the waste safely and responsibly until it can be treated in the Waste Treatment and Immobilization Plant for final disposition'. The Office of River Protection's work scope is currently performed through two primary contracts: - The Tank Operations Contract, held by Washington River Protection Solutions LLC, (WRPS) includes the construction, operation, and maintenance activities necessary to safely store, retrieve, and transfer tank wastes; provide supplemental tank waste treatment; provide storage and/or disposal of primary and secondary waste streams; design, construction and commissioning of the Low-Activity Waste Pretreatment System; and support ORP to integrate Hanford Tank Waste Treatment and Immobilization Plant (WTP) completion and startup with Tank Farms operations. - The WTP Contract, held by Bechtel National, Inc. (BNI), includes the design, construction, and commissioning of a Pretreatment Facility, two vitrification facilities (one for high-level waste and one for low-activity waste), a dedicated analytical laboratory, and supporting facilities to treat radioactive tank wastes by immobilizing them into a stable glass waste form. One System was established as a means to improve the integration between the tank farms and the WTP project to support its safe and successful startup. One System's scope and purpose focus on mission integration consistent with DOE's plans to treat tank waste in phases, starting with direct feed of the low-activity waste stream to the WTP's Low-Activity Waste (LAW) Vitrification Facility (referred to as DFLAW). The One System organization now has four major focus areas: - Flowsheet Integration? Integrated River Protection Project (RPP) flowsheet development and management; developing a gaps, risks, and opportunities management plan and technical roadmap; and waste feed qualification. - Mission Analysis and Planning? Strategic planning, system planning, and modeling integration. - WTP Startup, Commissioning, and Operations Integration? Interface Control Document (ICD) management, coordinating facilities startup-to-commissioning-to-operations, contract directives and standards identification, and DFLAW program integration. - Project Integration and Controls? Integrated schedule, metrics/dashboards monitoring, and One System risk register. ORP established the DFLAW Program Office in February 2015 as one of its key performance goals. ORP staff, along with contractor managers, have identified roles and responsibilities for the each of the four major focus areas. One System has established an Executive Council and Governance Board to drive program progress and make decisions on DFLAW. This approach allows appropriate government and contractor senior management involvement in the DFLAW Program. Monthly critical path analysis on the integrated DFLAW schedule is being performed. Interface control documents specific to DFLAW have been developed, and system planning and modeling tools are being used to help define the DFLAW flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct Feed Low Activity Waste Program Integration - 16638

The mission of Program Integration is to champion and steer the development and implementation of common and consistent programs between the Tank Operating Contract (TOC) contractor and the Waste Treatment Plant (WTP) contractor. TOC is managed by Washington River Protection Solutions LLC (WRPS) and WTP is managed by Bechtel National, Inc. (BNI). The DOE Office of River Protection (DOE ORP) is the Program Owner. WRPS has been actively managing the TOC at the Hanford Site Tank Farms (TF) since 2008. Programs are already developed, verified, and in use for the TOC, whereas WTP is still in the construction phase. WTP Programs are established for construction only, but not developed for commissioning and future operations. An extensive effort is underway at WTP to develop commissioning programs. In order to drive consistency and minimize differences in program requirements between TF, which will feed the tank waste, and WTP, which will receive and treat the tank waste, DOE-ORP requires the two contractors to integrate and collaborate in program development. Advantages of integration are: - Achieves cost and time savings as WTP is able to review existing TOC programs as starting points in development of its programs. - Promotes interfaces with industry counterparts to share experiences, issues, and lessons learned. ? Minimizes difference in program requirements between the companies. - Helps prepare for and ultimately succeed in Operational Readiness Reviews (ORR). Program Integration is a priority for TOC and WTP, and in order to maintain the focus and drive to this effort, a unified One System Program Integration Council (OSPIC) was created in 2012. Membership of the OSPIC consists of senior managers from both companies and the OSPIC chair's report directly to their respective President. Thirty (30) programs are subject to integration, including but not limited to Conduct of Operations, Worker Safety and Health, Quality Assurance, Contractor Assurance, and Environmental Management. Progress of program development and integration efforts are tracked and monitored, and barriers to integration are resolved in a collaborative fashion within both companies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗