Pure niobium as a pressure vessel material

Physics laboratories around the world are developing niobium superconducting radio frequency (SRF) cavities for use in particle accelerators. These SRF cavities are typically cooled to low temperatures by direct contact with a liquid helium bath, resulting in at least part of the helium container being made from pure niobium. In the U.S., the Code of Federal Regulations allows national laboratories to follow national consensus pressure vessel rules or use of alternative rules which provide a level of safety greater than or equal to that afforded by ASME Boiler and Pressure Vessel Code. Thus, while used for its superconducting properties, niobium ends up also being treated as a material for pressure vessels. This report summarizes what we have learned about the use of niobium as a pressure vessel material, with a focus on issues for compliance with pressure vessel codes. We present results of a literature search for mechanical properties and tests results, as well as a review of ASME pressure vessel code requirements and issues.

43 PARTICLE ACCELERATORS↗

Infrastructure Development of Single Cell Testing Capability at A0 Facility

The objective of this technical note is to document the details of the infrastructure development process that was realized at the A0 photo injector facility to establish RF cold testing capability for 1.3 GHz superconducting niobium single cell cavities. The activity began the last quarter of CY 2006 and ended the first quarter of CY 2009. The whole process involved addressing various aspects such as design of vertical insert and lifting fixture, modification of existing RF test station and design of new couplers, development of a Temperature Mapping (T-Map) system, radiation considerations for the test location (north cave), update of existing High Pressure Rinse (HPR) system, preparation of necessary safety documents and eventually obtaining an Operational Readiness Clearance (ORC). Figure 1 illustrates the various components of the development process. In the past, the north cave test station at A0 has supported the cold testing 3.9 GHz nine cell and single cell cavities, thus some of the components were available for use and some needed modification. The test dewar had the capacity to accommodate 1.3 GHz single cells although a new vertical insert that could handle both cavity types (1.3 and 3.9 GHz) had to be designed. The existing cryogenic system with an average capacity of {approx} 0.5 g/sec was deemed sufficient. The RF system was updated with broadband components and an additional amplifier with higher power capacity to handle higher gradients usually achieved in 1.3 GHz cavities. The initial testing phase was arbitrated to proceed with fixed power coupling. A new temperature mapping system was developed to provide the diagnostic tool for hot spot studies, quench characterization and field emission studies. The defining feature of this system was the use of diode sensors instead of the traditional carbon resistors as sensing elements. The unidirectional current carrying capacity (forward bias) of the diodes provided for the ease of multiplexing of the system, thus substantially reducing the number of cables required to power the sensors. The high gradient capacity of the 1.3 GHz cavities required a revision of the radiation shielding and interlocks. The cave was updated as per the recommendations of the radiation safety committee. The high pressure rinse system was updated with new adapters to assist the rinsing 1.3 GHz single cell cavities. Finally, a proposal for cold testing 1.3 GHz single cell cavities at A0 north cave was made to the small experiments approval committee, radiation safety committee and the Tevatron cryogenic safety sub-committee for an operational readiness clearance and the same was approved. The project was classified under research and development of single cell cavities (project 18) and was allocated a budget of $200,000 in FY 2007.

43 PARTICLE ACCELERATORS↗

Tensile tests of niobium material for SRF cavities

Mechanical tests of cavity-grade niobium samples were conducted to provide engineering information for the certification of 3rd-harmonic superconducting radio-frequency cavities and cryomodules. Large changes of mechanical properties occur throughout the cavity fabrication process due to the cold work introduced by forming, the heating introduced by electron beam welding, and the recovery of cold work during the anneal used to degas hydrogen after chemical processing. Data is provided here to show the different properties at various stages of fabrication, including both weld regions and samples from the bulk niobium far away from the weld. Measurements of RRR were used to assure that any contamination during annealing was negligible.

43 PARTICLE ACCELERATORS↗

Atomic Layer Deposition for SRF Cavities

We have begun using Atomic Layer Deposition (ALD) to synthesize a variety of surface coatings on coupons and cavities as part of an effort to produce rf structures with significantly better performance and yield than those obtained from bulk niobium, The ALD process offers the possibility of conformally coating complex cavity shapes with precise layered structures with tightly constrained morphology and chemical properties. Our program looks both at the metallurgy and superconducting properties of these coatings, and also their performance in working structures. Initial results include: (1) results from ALD coated cavities and coupons, (2) new evidence from point contact tunneling (PCT) showing magnetic oxides can be a significant limitation to high gradient operation, (3) a study of high pressure rinsing damage on niobium samples.

43 PARTICLE ACCELERATORS↗

Current and Future High Power Operation of Fermilab Main Injector

Fermilab's Main Injector on acceleration cycles to 120 GeV has been running a mixed mode operation delivering beam to both the antiproton source for pbar production and to the NuMI[1] target for neutrino production since 2005. On January 2008 the slip stacking process used to increase the beam to the pbar target was expanded to include the beam to the NuMI target increasing the MI beam power at 120 GeV to 400KW. The current high power MI operation will be described along with the plans to increase the power to 700KW for NOvA and to 2.1 MW for project X.

43 PARTICLE ACCELERATORS↗

Coexistance of spin-density wave and superconductivity in Ba{sub 1-x}K{sub x}Fe{sub 2}As{sub 2}.

The relation between the spin-density wave (SDW) and superconducting order is a central topic in the current research on the FeAs-based high-T{sub c} superconductors. Conflicting results exist in the LaFeAs(O, F)-class of materials, for which whether the SDW and superconductivity are mutually exclusive or they can coexist has not been settled. Here we show that for the (Ba, K)Fe{sub 2}As{sub 2} system, the SDW and superconductivity can coexist in an extended range of compositions. The availability of single crystalline samples and high value of the energy gaps would make the materials a model system to investigate the high-T{sub c} ferropnictide superconductivity.

36 MATERIALS SCIENCE↗

Augmentation of Cavity Optical Inspection by Replicas Without Performance Degradation

Although cavity optical inspection systems provide a huge amount of qualitative information about surface features, the amount of quantitative topographic informa-tion is limited. Here, we report the use of silicone-based RTV for replicas and moldings that provide increased details of topographic data associated with the optical cavity images. Profilometry scans of the molds yield mi-crometer-scale details associated with equator weld struc-tures and weld pits. This confirms at least two different types of pits, one which is bowl-shaped, and one which has a small peak at the bottom. The contour information extracted from profilometry can be used to evaluate mechanisms by which pits and other features limit RF performance. We present calculations based on a con-formal transformation of the profiles above. We also show that application of the replica followed by rinsing does not adversely affect the cavity performance.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Electropolishing at ANL/FNAL.

A system for electropolishing of 1.3 GHz elliptical single- and nine-cell cavities is in operation at the joint ANL/FNAL cavity processing facility located at Argonne. The system is one peice of a larger 200 m2 complete single cavity processing and assembly facility which also includes clean rooms and high-pressure rinsing. Recently, the electropolishing system has been used to process a series of single and nine-cell cavities. For single cell cavities a good set of EP parameters has been demonstrated based on more than a half dozen complete processing and cold test cycles at ANL/FNAL. The lastest six single cell cavities each exceed EACC=35 MV/m and, at this gradient, have Q in the range 6 10{sup 9} - 1 10{sup 10}. The first nine cell cavities electropolished at ANL have not yet reached similar fields ({approx}23 MV/m-26 MV/m) and ongoing activities are focussed on demonstrating >30 MV/m in these cavities. Suitable nine cell EP parameters using the ANL/FNAL EP system including acid/water temperatures, flow rates, current, voltage, air flow etc. are all substantially different than for single-cell cavities and are discussed here.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Radiation shielding for superconducting RF cavity test facility at A0

The results of Monte Carlo radiation shielding study performed with the MARS15 code for the vertical test facility at the A0 north cave enclosure at Fermilab are presented and discussed. The vertical test facility at the A0 north cave is planned to be used for testing 1.3 GHz single-cell superconducting RF cavities with accelerating length of 0.115 m. The operations will be focused on high accelerating gradients--up to 50 MV/m. In such a case the facility can be a strong radiation source [1]. When performing a radiation shielding design for the facility one has to take into account gammas generated due to interactions of accelerated electrons with cavity walls and surroundings (for example, range of 3.7-MeV electrons in niobium is approximately 3.1 mm while the thickness of the niobium walls of such RF cavities is about 2.8 mm). The electrons are usually the result of contamination in the cavity. The radiation shielding study was performed with the MARS15 Monte Carlo code [2]. A realistic model of the source term has been used that describes spatial, energy and angular distributions of the field-emitted electrons inside the RF cavities. The results of the calculations are normalized using the existing experimental data on measured dose rate in the vicinity of such RF cavities.

43 PARTICLE ACCELERATORS↗

ECR plasma cleaning: an in-situ processing technique for RF cavities

A condition for Electron Cyclotron Resonance (ECR) can be established inside a fully assembled RF cavity without the need for removing high-power couplers. As such, plasma generated by this process can be used as a final cleaning step, or as an alternative cleaning step in place of other techniques. Tests showed filtered dry air plasma can successfully remove sulfur particles on niobium surface while the surface oxygen content remains intact.

43 PARTICLE ACCELERATORS↗

Neutron scattering investigation of the magnetic order in single crystalline BaFe2As2

The magnetic structure of BaFe{sub 2}As{sub 2} was determined from polycrystalline neutron diffraction measurements soon after the ThCr{sub 2}Si{sub 2}-type FeAs-based superconductors were discovered. Both the moment direction and the in-plane antiferromagnetic wavevector are along the longer a-axis of the orthorhombic unit cell. There is only one combined magnetostructural transition at {approx}140 K. However, a later single-crystal neutron diffraction work reported contradicting results. Here, we show neutron diffraction results from a single-crystal sample, grown by a self-flux method, that support the original polycrystalline work.

36 MATERIALS SCIENCE↗