Search NASA⌕ Search

Engineering topics

Yang, Kan

Publications and source records attributed to Yang, Kan.

At least 19 records

Optical Instrument Thermal Control on the Large Ultraviolet/Optical/Infrared Surveyor

The Large Ultraviolet/Optical/Infrared Surveyor (LUVOIR) is a multi-wavelength observatory commissioned by NASA as one of four large mission concept studies for the Astro2020 Decadal Survey. Two concepts are under study which bound a range of cost, risk, and scientific return: an 8-meter diameter unobscured segmented aperture primary mirror and a 15-meter segmented aperture primary mirror. Each concept carries with it an accompanying suite of instruments. The Extreme Coronagraph for Living Planetary Systems (ECLIPS) is a near-ultraviolet (NUV) / optical / near-infrared (NIR) coronagraph; the LUVOIR Ultraviolet Multi-object Spectrograph (LUMOS) provides multi-object imaging spectroscopy in the 100-400 nanometer ultraviolet (UV) range; and the High Definition Imager (HDI) is a wide field-of-view near-UV / optical / near-IR camera that can also perform astrometry. The 15-meter concept also contains an additional instrument, Pollux, which is a high-resolution UV spectro-polarimeter. While the observatory is nominally at a 270 Kelvin operational temperature, the requirements of imaging in both IR and UV require separate detectors operating at different temperature regimes, each with stringent thermal stability requirements. The change in observatory size requires two distinct thermal designs per instrument. In this current work, the thermal architecture is presented for each instrument suite. We describe here the efforts made to achieve the target operational temperatures and stabilities with passive thermal control methods. Additional discussion will focus on how these instrument thermal designs impact the overall system-level architecture of the observatory and indicate the thermal challenges for hardware implementation.

LUVOIR↗

Optical Instrument Thermal Control on the Large Ultraviolet/Optical/Infrared Surveyor

The Large Ultraviolet/Optical/Infrared Surveyor (LUVOIR) is a multi-wavelength observatory commissioned by NASA as one of four large mission concept studies for the Astro2020 Decadal Survey. Two concepts are under study which bound a range of cost, risk, and scientific return: an 8-meter diameter unobscured segmented aperture primary mirror and a 15-meter segmented aperture primary mirror. Each concept carries with it an accompanying suite of instruments. The Extreme Coronagraph for Living Planetary Systems (ECLIPS) is a near-ultraviolet (NUV) / optical / near-infrared (NIR) coronagraph; the LUVOIR Ultraviolet Multi-object Spectrograph (LUMOS) provides multi-object imaging spectroscopy in the 100-400 nanometer ultraviolet (UV) range; and the High Definition Imager (HDI) is a wide field-of-view near-UV / optical / near-IR camera that can also perform astrometry. The 15-meter concept also contains an additional instrument, Pollux, which is a high-resolution UV spectro-polarimeter. While the observatory is nominally at a 270 Kelvin operational temperature, the requirements of imaging in both IR and UV require separate detectors operating at different temperature regimes, each with stringent thermal stability requirements. The change in observatory size requires two distinct thermal designs per instrument. In this current work, the thermal architecture is presented for each instrument suite. We describe here the efforts made to achieve the target operational temperatures and stabilities with passive thermal control methods. Additional discussion will focus on how these instrument thermal designs impact the overall system-level architecture of the observatory and indicate the thermal challenges for hardware implementation.

Decadal Study↗

Overview of the Optomechanical Design of the LUVOIR Instruments

The Large Ultraviolet/Optical/Infrared Surveyor (LUVOIR) is a space telescope being submitted for review to the 2020 Decadal Survey in Astronomy and Astrophysics. Its science objectives include both direct imaging and spectral characterization of habitable exoplanets around sun-like stars, the study of planet, star, and galaxy formation, the transfer of matter between different galaxies, and the remote sensing of objects within the Solar System. Two architectures have been designed: a 15 m diameter on-axis telescope (LUVOIR-A) and an 8 m off-axis telescope (LUVOIR-B). This paper discusses the opto-mechanical design of the three LUVOIR instruments: the High Definition Imager (HDI), the LUVOIR UV Multi-object Spectrograph (LUMOS), and the Extreme Coronagraph for Living Planetary Systems (ECLIPS). For both the LUVOIR-A and LUVOIR-B variants of each instrument, optical design specifications are presented including first-order constraints, packaging requirements, and optical performance metrics. These factors are used to illustrate the final design of each instrument and LUVOIR as a whole. In addition to the optical designs, mechanical models are presented for each instrument showing the optical mounts, mechanisms, support structure, etc.

Decadal Study↗

The Large UV/Optical/Infrared Surveyor Decadal Mission Concept Thermal System Architecture

The Large Ultraviolet/Optical/Infrared (LUVOIR) Surveyor is one of four large strategic mission concept studies commissioned by NASA for the 2020 Decadal Survey in Astronomy and Astrophysics. Slated for launch to the second Lagrange point (L2) in the mid-to-late 2030s, LUVOIR seeks to directly image habitable exoplanets around sun-like stars, characterize their atmospheric and surface composition, and search for biosignatures, as well as study a large array of astrophysics goals including galaxy formation and evolution. Two observatory architectures are currently being considered which bound the trade-off between cost, risk, and scientific return: a 15-meter diameter segmented aperture primary mirror in a three-mirror anastigmat configuration, and an 8-meter diameter unobscured segmented aperture design. To achieve its science objectives, both architectures require milli-Kelvin level thermal stability over the optics, structural components, and interfaces to attain picometer wavefront RMS stability. A 270 Kelvin operational temperature was chosen to balance the ability to perform science in the near-infrared band and the desire to maintain the structure at a temperature with favorable material properties and lower contamination accumulation. This paper will focus on the system-level thermal designs of both LUVOIR observatory architectures. It will detail the various thermal control methods used in each of the major components - the optical telescope assembly, the spacecraft bus, the sunshade, and the suite of accompanying instruments - as well as provide a comprehensive overview of the analysis and justification for each design decision. It will additionally discuss any critical thermal challenges faced by the engineering team should either architecture be prioritized by the Astro2020 Decadal Survey process to proceed as the next large strategic mission for development.

Yang, Kan↗

The Large UV/Optical/Infrared Surveyor Decadal Mission Concept Thermal System Architecture

The Large Ultraviolet/Optical/Infrared (LUVOIR) Surveyor is one of four large strategic mission concept studies commissioned by NASA for the 2020 Decadal Survey in Astronomy and Astrophysics. Slated for launch to the second Lagrange point (L2) in the mid-to-late 2030s, LUVOIR seeks to directly image habitable exoplanets around sun-like stars, characterize their atmospheric and surface composition, and search for biosignatures, as well as study a large array of astrophysics goals including galaxy formation and evolution. Two observatory architectures are currently being considered which bound the trade-off between cost, risk, and scientific return: a 15-meter diameter segmented aperture primary mirror in a three-mirror anastigmat configuration, and an 8-meter diameter unobscured segmented aperture design. To achieve its science objectives, both architectures require milli-Kelvin level thermal stability over the optics, structural components, and interfaces to attain picometer wavefront RMS stability. A 270 Kelvin operational temperature was chosen to balance the ability to perform science in the near-infrared band and the desire to maintain the structure at a temperature with favorable material properties and lower contamination accumulation. This paper will focus on the system-level thermal designs of both LUVOIR observatory architectures. It will detail the various thermal control methods used in each of the major components - the optical telescope assembly, the spacecraft bus, the sunshade, and the suite of accompanying instruments - as well as provide a comprehensive overview of the analysis and justification for each design decision. It will additionally discuss any critical thermal challenges faced by the engineering team should either architecture be prioritized by the Astro2020 Decadal Survey process to proceed as the next large strategic mission for development.

Yang, Kan↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part II: Thermal Analysis

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the multiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

Testing↗

The Large UV/Optical/Infrared Surveyor (LUVOIR): Decadal Mission Concept Study Update

In preparation for the 2020 Decadal Survey in Astronomy and Astrophysics, NASA commissioned the study of four large mission concepts: the Large UV/Optical/Infrared Surveyor (LUVOIR), the Habitable Exoplanet Imager (HabEx), the far-infrared surveyor Origins Space Telescope (OST), and the X-ray surveyor Lynx. The LUVOIR Science and Technology Definition Team (STDT) has identified a broad range of science objectives for LUVOIR that include the direct imaging and spectral characterization of habitable exoplanets around sun-like stars, the study of galaxy formation and evolution, the exchange of matter between galaxies, star and planet formation, and the remote sensing of Solar System objects. The LUVOIR Study Office, located at NASA's Goddard Space Flight Center (GSFC), is developing two mission concepts to achieve the science objectives. LUVOIR-A is a 15-meter segmented-aperture observatory that would be launched in an 8.4-m extended fairing on the Space Launch System (SLS) Block 2 configuration. LUVOIR-B is an 8-meter unobscured segmented aperture telescope that fits in a smaller, conventional 5-meter fairing, but still requires the lift capacity of the SLS Block 1B Cargo vehicle. Both concepts include a suite of serviceable instruments: the Extreme Coronagraph for Living Planetary Systems (ECLIPS), an optical/near-infrared coronagraph capable of delivering 10 (sup minus10) contrast at inner working angles as small as 2 lambda divided by D; the LUVOIR UV Multi-object Spectrograph (LUMOS), which will provide low- and medium-resolution UV (100-400 nanometer) multi-object imaging spectroscopy in addition to far-UV imaging; the High Definition Imager (HDI), a high-resolution wide-field-of-view NUV-Optical-NIR imager. LUVOIR-A also has a fourth instrument, Pollux, a high-resolution UV spectro-polarimeter being contributed by Centre National d'Etudes Spatiales (CNES). This paper provides an overview of the LUVIOR science objectives, design drivers, and mission concepts.

Decadal Study↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part I: Thermal Architecture

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the mutiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

OTIS↗

James Webb Space Telescope (JWST) Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryogenic Test Program and Results

In 2017, the James Webb Space Telescope Optical Telescope Element and Integrated Science Instrument Module (OTIS) underwent cryogenic optical testing at the Johnson Space Center. In this paper, we summarize the successful execution and results of this 100-day test, which was a major program milestone. We summarize the as-run test configuration and provide a top-level as-run timeline. We also provide the top-level functional, optical, thermal, and operational results from the test. We summarize the key technical issues encountered and the resolution of those issues. The results of the OTIS test indicate that the payload should be fully capable of delivering on JWST's exciting scientific potential.

Kimble, Randy A.↗

Off-Nominal Planning for the Cryogenic Vacuum Test of the JWST Optical Telescope Element/Integrated Science Instrument Module at JSC

The cryogenic thermal vacuum/thermal balance test of the James Webb Space Telescope (JWST) combined Optical Telescope Element (OTE)/Integrated Science Instrument Module (ISIM), known as the OTIS, at the Johnson Space Center (JSC) Chamber A in 2017 was likely the most complex test ever performed by NASA for an unmanned mission. The test of the combined flight Optical Telescope and ISIM elements was prefaced by years of modifications to chamber facilities, and included three extensive precursor tests of non-flight and flight hardware to establish safe and optimal test operational procedures. One critical part of the test preparation was planning for off-nominal events that could arise, including appropriate responses. In some cases, assurance of personnel and payload safety required modification of original test hardware and procedures which had to be validated before the final test could begin. This planning proved especially prescient for the OTIS test, as Hurricane Harvey struck the Houston area during the test in August 2017, and consequences for the precious payload could have been severe. This paper describes the extent of the thermal off-nominal planning undertaken for the OTIS test, including including safing for hurricanes, and some real-life effects of Hurricane Harvey on the test conduct. Documentation of the consequences and mitigations for these events are discussed. The importance of off-nominal planning for future thermal vacuum/thermal balance tests is illustrated.

Off-Nominal Planning↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in mid-2020, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20 K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is an assessment of thermal model pre-test prediction performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. The insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Testing↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. It examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

JWST↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center’s Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Yang, Kan↗

The Large UV/Optical/Infrared Surveyor (LUVOIR): Decadal Mission Study Update

NASA commissioned the study of four large mission concepts, including the Large Ultraviolet / Optical / Infrared (LUVOIR) Surveyor, to be evaluated by the 2020 Decadal Survey in Astrophysics. In response, the Science and Technology Definition Team (STDT) identified a broad range of science objectives for LUVOIR that include the direct imaging and spectral characterization of habitable exoplanets around sun-like stars, the study of galaxy formation and evolution, the exchange of matter between galaxies, star and planet formation, and the remote sensing of Solar System objects. To meet these objectives, the LUVOIR Study Office, located at NASA's Goddard Space Flight Center (GSFC), completed the first design iteration of a 15-m segmented-aperture observatory that would be launched by the Space Launch System (SLS) Block 2 configuration. The observatory includes four serviceable instruments: the Extreme Coronagraph for Living Planetary Systems (ECLIPS), an optical / near-infrared coronagraph capable of delivering 10(exp -10) contrast at inner working angles as small as 2 lambda/D; the LUVOIR UV Multi-object Spectrograph (LUMOS), which will provide low- and medium-resolution UV (100 - 400 nm) multi-object imaging spectroscopy in addition to far-UV imaging; the High Definition Imager (HDI), a high-resolution wide-field-of-view NUV-Optical-NIR imager; and Pollux, a high-resolution UV spectro-polarimeter being contributed by Centre National d'Etudes Spatiales (CNES). The study team has executed a second design iteration to further improve upon the 15-m concept, while simultaneously studying an 8-m concept. In these proceedings, we provide an update on these two architectures.

cosmic origins↗

Augmented Method to Improve Thermal Data for the Figure Drift Thermal Distortion Predictions of the JWST OTIS Cryogenic Vacuum Test

The JWST Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and is scheduled for launch in 2018. The JWST OTE, including the 18 segment primary mirror, secondary mirror, and the Aft Optics Subsystem (AOS) are designed to be passively cooled and operate near 45K. These optical elements are supported by a complex composite backplane structure. As a part of the structural distortion model validation efforts, a series of tests are planned during the cryogenic vacuum test of the fully integrated flight hardware at NASA JSC Chamber A. The successful ends to the thermal-distortion phases are heavily dependent on the accurate temperature knowledge of the OTE structural members. However, the current temperature sensor allocations during the cryo-vac test may not have sufficient fidelity to provide accurate knowledge of the temperature distributions within the composite structure. A method based on an inverse distance relationship among the sensors and thermal model nodes was developed to improve the thermal data provided for the nanometer scale WaveFront Error (WFE) predictions. The Linear Distance Weighted Interpolation (LDWI) method was developed to augment the thermal model predictions based on the sparse sensor information. This paper will encompass the development of the LDWI method using the test data from the earlier pathfinder cryo-vac tests, and the results of the notional and as tested WFE predictions from the structural finite element model cases to characterize the accuracies of this LDWI method.

Thermal Modeling↗

Thermal Considerations for Reducing the Cooldown and Warmup Duration of the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in 2018, is NASAs next-generation flagship telescope. The Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) contain all of the optical surfaces and instruments to capture and analyze the telescopes infrared targets. The integrated OTE and ISIM are denoted as OTIS, and will be tested as a single unit in a critical thermal-vacuum test in mid-2017 at NASA Johnson Space Centers Chamber A facility. The payload will be evaluated for workmanship and functionality in a 20K simulated flight environment during this thermal-vacuum test. However, the sheer thermal mass of the OTIS payload as well as the restrictive gradient, rate, and contamination-related constraints placed on test components precludes rapid cooldown or warmup to its steady-state cryo-balance condition. Hardware safety considerations precludes injection of helium gas for free molecular heat transfer. Initial thermal analysis predicted that transient radiative cooldown from ambient temperatures, while meeting all limits and constraints, would take 33.3 days; warmup similarly would take 28.4 days. This paper discusses methods used to reduce transition times from the original predictions through modulation of boundary temperatures and environmental conditions. By optimizing helium shroud transition rates and heater usage, as well as rigorously re-examining previously imposed constraints, savings of up to three days on cooldown and up to a week on warmup can be achieved. The efficiencies gained through these methods allow the JWST thermal test team to create faster cooldown and warmup profiles, thus reducing the overall test duration and cost, while keeping all of the required test operations.

Thermal↗

Thermal Considerations for Reducing the Cooldown and Warmup Duration of the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in 2018, is NASAs next-generation flagship telescope. The Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) contain all of the optical surfaces and instruments to capture and analyze the telescopes infrared targets. The integrated OTE and ISIM are denoted as OTIS, and will be tested as a single unit in a critical thermal-vacuum test in mid-2017 at NASA Johnson Space Centers Chamber A facility. The payload will be evaluated for workmanship and functionality in a 20K simulated flight environment during this thermal-vacuum test. However, the sheer thermal mass of the OTIS payload as well as the restrictive gradient, rate, and contamination-related constraints placed on test components precludes rapid cooldown or warmup to its steady-state cryo-balance condition. Hardware safety considerations precludes injection of helium gas for free molecular heat transfer. Initial thermal analysis predicted that transient radiative cooldown from ambient temperatures, while meeting all limits and constraints, would take 33.3 days; warmup similarly would take 28.4 days. This paper discusses methods used to reduce transition times from the original predictions through modulation of boundary temperatures and environmental conditions. By optimizing helium shroud transition rates and heater usage, as well as rigorously re-examining previously imposed constraints, savings of up to three days on cooldown and up to a week on warmup can be achieved. The efficiencies gained through these methods allow the JWST thermal test team to create faster cooldown and warmup profiles, thus reducing the overall test duration and cost, while keeping all of the required test operations.

JWST↗