Ground and Onboard Automated Scheduling for the Mars 2020 Rover Mission
No abstract provided
Engineering topics
Publications and source records attributed to Yelamanchili, Amruta.
No abstract provided
The Mars 2020 Rover mission is using automated scheduling in two capacities. As of March 2021 a ground-based scheduler automatically schedules rover wake/sleep and preheats to support Mars 2020 daily operations. Included in the ground system is an explainable scheduling tool that allows users in-sight into the schedule developed by the automated scheduler. An onboard scheduler that will allow the rover autonomously better account for variations in execution is in development for use later in the mission.
The National Aeronautics and Space Administration’s (NASA) Mars 2020 Rover, named Perseverance, landed on the surface of Mars in Jezero Crater on February 18, 2021. Since the landing, the rover’s activities have been planned with the aid of a ground-based automated scheduling system called Copilot. Automated scheduling is very rare for planetary rover missions. Historically humans have created a schedule manually and ensured that the schedule satisfied all constraints. Higher levels of automation in the system allows science planners to produce schedules for the rover more quickly. In addition to scheduling user-provided activities, Copilot generates and schedules two types of support activities: sleep activities and heating activities. Some activities require the CPU to be on as they execute, so Copilot schedules wakeups and shutdowns of the CPU at the appropriate times. Some activities require areas of the rover to be heated before they can execute, and that heating must be maintained throughout the duration of the activity. Copilot schedules the preheat and maintenance heating activities for the user-provided activities that require them. To facilitate Copilot usage, the Crosscheck tool shows the science planners how Copilot constructed a schedule. For activities that fail to be scheduled, Crosscheck gives information on the constraints that the activity would have violated. This gives the users insight into how to change the input activities and constraints in order to achieve a schedule that satisfies their goals.
The Earth Surface Mineral Dust Source InvesTigation (EMIT) is an Earth Ventures-Instrument (EVI-4) mission to map the surface mineralogy of arid dust source regions. EMIT used automated scheduling technology to analyze aspects of the mission design. The automated scheduling technology was used to construct schedules which were then automatically analyzed with respect to science acquired. These analyses can be performed for a range of spacecraft hardware configurations, observation strategies, and science requirements. By studying the effects of changes on the above inputs, better hardware configurations, observation strategies, and science requirements can be formulated. The use of a pointing mirror on EMIT was under consideration, and this analysis aided in determining whether or not to keep it as part of the design of the instrument. Clouds will also have a large impact on the coverage of science targets achievable by the mission. Analysis was done on how clouds could impact the coverage achievable as well as the data volume. This analysis with clouds also aided in determining the coverage criteria for the mission. It was necessary to find a criteria that was achievable with some margin as well as satisfies the science goals of the mission.
This paper describes the development and use of an automated scheduling system for the National Aeronautics and Space Administration’s (NASA) Orbiting Carbon Observatory-3 (OCO-3) Mission. OCO-3 measures atmospheric carbon dioxide from space. Made from the spare instrument built as a backup to the Orbiting Carbon Observatory-2 (OCO-2), OCO-3 extends the rich set of data collected by OCO-2. OCO-3 is outfitted with an agile Pointing Mirror Assembly (PMA) that allows for more detailed types of observations and rapid mode transitions. The mission uses an adaptation of the Compressed Large-scale Activity Scheduling and Planning (CLASP) system for scheduling nominal operations, as well as a separate automated scheduling system developed for scheduling observations for the calibration of the PMA. CLASP is used to schedule the four types of observational modes: Nadir, Glint, Target, and Snapshot Area Map. OCO-3 has a variety of complex mission-specific geometric constraints that were incorporated into CLASP to produce schedules that ensure instrument safety.
This paper describes the development and use of an automated scheduling system for the National Aeronautics and Space Administration’s (NASA) ECOsystem Spaceborne Thermal Radiometer Experiment on Space Station (ECOSTRESS) mission. Key to the success of the ECOSTRESS mission has been the use of automated scheduling in mission analysis pre-launch, and in successful operations where automated scheduling was deployed to address several operational challenges. ECOSTRESS uses an adaptation of the Compressed Large-scale Activity Scheduling and Planning (CLASP) system to automatically select science observations respecting area and point target priorities as well as visibility, illumination, onboard storage, and radiation constraints to satisfy high-level prioritized science campaigns. The ECOSTRESS scheduler was used pre-launch to predict the effectiveness of alternative formulations of science campaign definitions accounting for the impact of data volume, keepout, and orbit/illumination/visibility constraints to derive the initial operational science campaign definitions and priorities. The scheduler was then used after instrument checkout for operations. ECOSTRESS has faced multiple operational challenges relating to instrument firmware and hardware, and the scheduler has been updated several times to address these challenges. The instrument Mass Storage Units (MSUs) had operational issues, requiring the scheduler to plan for and schedule commands to handle intricacies of data management. After many months of operations, both MSUs on the instrument became non-functioning and the firmware of the instrument was updated to bypass the MSUs. A further update to the ECOSTRESS scheduler enabled the scheduler to operate in this new operations mode. The ECOSTRESS scheduler has also been updated to improve handling of along-track uncertainty inherent in International Space Station operations. The flexibility and ease of updating of the automated scheduler has been a significant contributor to successful operations of the ECOSTRESS mission.
No abstract provided
No abstract provided
No abstract provided
Understanding the reasoning behind the behavior of an auto- mated scheduling system is essential to ensure that it will be trusted and consequently used to its full capabilities in critical applications. In cases where a scheduler schedules activities in an invalid location, it is usually easy for the user to infer the missing constraint by inspecting the schedule with the in- valid activity to determine the missing constraint. If a sched- uler fails to schedule activities because constraints could not be satisfied, determining the cause can be more challenging. In such cases it is important to understand which constraints caused the activities to fail to be scheduled and how to al- ter constraints to achieve the desired schedule. In this pa- per, we describe such a scheduling system for NASA’s Mars 2020 Perseverance Rover, as well as Crosscheck, an explain- able scheduling tool that explains the scheduler behavior. The scheduling system and Crosscheck are the baseline for oper- ational use to schedule activities for the Mars 2020 rover. As we describe, the scheduler generates a schedule given a set of activities and their constraints and Crosscheck: (1) provides a visual representation of the generated schedule; (2) analyzes and explains why activities failed to schedule given the con- straints provided; and (3) provides guidance on potential con- straint relaxations to enable the activities to schedule in future scheduler runs.
No abstract provided