Search NASA⌕ Search

Engineering topics

You, Sesun

Publications and source records attributed to You, Sesun.

Energy management systems for forecasted demand error compensation using hybrid energy storage system in nanogrid

This paper proposes an energy management system (EMS) for nanogrids to balance the power supply and forecasted demand in consideration of forecasting errors arising from high instantaneous demand. The proposed EMS employs a power-balancing optimization process for forecasted demand and a reference power modulation strategy for forecasting errors. This power-balancing optimization utilizes nanogrid sources, such as photovoltaics, fuel cells, and batteries, to meet forecasted demand and a supercapacitor charging process to overcome issues with a low energy density. The proposed reference power modulation strategy is utilized to allocate power from a hybrid energy storage system consisting of a battery and supercapacitor in order to compensate for forecasting errors. In addition, this proposed strategy considers battery and supercapacitor constraints such as the power changing rate and total power limitations. Further, the power-balancing optimization process also operates at faster sampling rate than the reference power modulation process in order to improve the computational efficiency. The performance of the proposed EMS is evaluated using real data obtained from the Korea Electric Power Exchange.

25 ENERGY STORAGE↗

Gradient-Descent-Based Learning Gain for Backstepping Controller and Disturbance Observer of Nonlinear Systems

This paper proposes a gradient-descent-based learning (GL) gain for backstepping controller and disturbance observer (DOB) of nonlinear system. The proposed method consists of the GL gain update law, controller, and DOB. The GL gain update law is proposed to adapt the control gain and DOB gain according to the direction that minimizes the cost function. The mathematical analysis reveals that the GL gain always has a positive sign and upper bound. The controller is designed via a backstepping procedure to track the desired output with GL control gain. The DOB is designed to estimate the unknown external disturbance with the GL DOB gain. Because the control and DOB gains are simultaneously tuned to achieve improved performance, the time consumption for tuning can be reduced. In addition, the peaking phenomenon can be avoided initially by a small initial value of GL gains. The stability of the closed-loop system is guaranteed using the input-to-state stability property. The performance of the proposed method was validated via simulations and experiments using a DC motor.

42 ENGINEERING↗