Implementing a Direct-Feed Low-Activity Waste Capability in the Hanford Waste Treatment Plant - 18332

The original design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE) has developed a sequenced approach to completing the WTP Project, beginning with feeding some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. Sending low-activity waste from the tank farms to the LAW Facility is referred to as direct-feed LAW (DFLAW). Under this plan, low-activity waste will be pretreated in the Hanford tank farms for cesium and solids separation to meet LAW Facility waste acceptance criteria and produce an acceptable low-activity waste product. The waste feed will then be transferred to the LAW Facility where it will be immobilized in glass, poured into stainless steel containers, and then transported by truck to the Integrated Disposal Facility, a mixed low-level waste disposal site located in the Hanford 200 East Area. The DFLAW operation will deliver about 1 million gallons of double-shell tank waste for treatment each year of operation, and nominally produce 21 metric tons of immobilized low-activity waste glass per day. The resultant freed space in the double-shell tanks will support safe tank farm operations and staging of additional waste for treatment. In December 2016 DOE executed a contract modification and approved a change to the project's performance baseline to complete the LAW Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. The contract modification and revised performance baseline support completion and hot commissioning of WTP facilities needed for DFLAW operations is as early as January 2022. DOE has made significant progress on design, equipment procurements, and civil construction of modifications required to implement the DFLAW capability in the WTP, including progress on civil construction of a new effluent management facility, which will process secondary liquid waste resulting from LAW Facility vitrification operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing a Low Activity Waste Direct Feed Capability in the Hanford Waste Treatment Plant - 17277

The original design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE) has developed a sequenced approach to completing the WTP Project, beginning with feeding some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. Sending low-activity waste from the tank farms to the LAW Facility is referred to as direct-feed LAW (DFLAW). Using this approach, low-activity waste will be pretreated in a Low-Activity Waste Pretreatment System (LAWPS) for cesium and solids separation to meet LAW Facility safety basis requirements and produce an acceptable low-activity waste product. The waste feed will then be transferred to the LAW Facility where it will be immobilized in glass, poured into stainless steel containers, and then transported by truck to the Integrated Disposal Facility, a mixed waste burial ground located in the Hanford 200-East Area. The primary driver for the DFLAW approach is to enable commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste (HLW) facilities. As such, the functions intended to be provided to the LAW Facility by the PT Facility and the common functionality with the HLW Facility must be refined and modified to enable DFLAW operations. The DFLAW approach will provide necessary systems and facilities to replace these enabling PT Facility functions until the PT Facility is completed and commissioned. For example, liquid effluents from the LAW Facility, primarily melter offgas condensate, will be processed in a new effluent management facility (EMF) within the WTP footprint rather than sending the effluent back to the PT Facility for processing. During DFLAW operations approximately 3 785 m{sup 3} (1 million gallons) of double-shell tank (DST) waste will be delivered to WTP for treatment each year of operation, and nominally produce 21 metric tons of immobilized low-activity waste glass per day. The resultant freed space in the DSTs will support safe tank farm operation and staging of additional waste for treatment. In December 2016, DOE executed a contract modification and approved an incremental change to the project's performance baseline to complete the WTP facilities needed to allow direct feed of low-activity waste to the LAW Facility. The revised performance baseline supports completion and cold commissioning of the WTP facilities needed for DFLAW operations no later than August 2023. The design of modifications to WTP facilities needed to enable DFLAW operations is more that 60 percent complete. DOE approved the preliminary safety basis for DFLAW modifications to WTP based on the 30 percent design package in early 2016. Early construction work for DFLAW modifications to WTP began in mid-2015. Long-lead procurement actions for some of the more complex equipment needed for LAW Facility effluent treatment were initiated in early 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transitioning from Construction to Startup for the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility - 17284

The original design of the Waste Treatment and Immobilization Plant (WTP) required all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has developed a sequenced approach to completing the WTP Project, beginning with delivering some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. This operating configuration is referred to as direct-feed LAW (DFLAW). The primary driver for the DFLAW approach is to enable startup and commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste facilities. In March 2016, a federal judge amended the Consent Decree between DOE and the State of Washington to require completion of hot commissioning for the LAW Facility no later than December 31, 2023. During the next few years ORP and the WTP contractor will transition the project from completion of construction to the startup and commissioning phase for the LAW Facility and the associated support facilities. The WTP contractor has developed an integrated management process to successfully conduct facility startup testing for the WTP facilities required to support DFLAW. The WTP contractor will also develop a commissioning plan and facility transition plan. These plans will describe the strategy; schedule; and requirements for safe, efficient, and sequential startup, commissioning, and transfer of the WTP facilities to an operations contractor. The WTP contractor has also established a strategy to achieve operational readiness for the facilities required to support DFLAW consistent with DOE O 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities and DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. ORP has established a strategy for oversight of the WTP contractor's startup, commissioning, and readiness activities. The strategy also encompasses ORP's own activities to achieve readiness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WTP Modifications to Support DFLAW: LAW, BOF, Lab - 16219

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind nuclear waste treatment facility being designed and constructed for the U.S. Department of Energy by Bechtel National, Inc. and principal subcontractor URS to process and vitrify radioactive waste stored in underground tanks at the Hanford Site. The Tank Operations Contractor, Washington River Protection Solutions, has responsibility to retrieve, stage, pretreat, and deliver the tank waste feed to WTP. To treat tank waste as soon as practicable, a scenario is being considered to deliver pretreated feed straight to WTP's Low-Activity Waste (LAW) Vitrification Facility. This scenario is called the Direct Feed LAW (DFLAW) program. Balance of Facility utility and system facilities are designed for full WTP operation. Thirteen of these are needed to support reduced throughput during DFLAW operation, of which eight require moderate to extensive changes. Extensive changes include permanent plant modifications that allow DFLAW to operate if the Pretreatment (PT) Facility is unavailable. Under full WTP operation, effluents from the LAW Facility will be returned to the PT Facility for further processing and/or transfer to the Liquid Effluent Retention Facility/Effluent Treatment Facility. The PT Facility also handles all flush water from the tank farm transfers. To address these requirements, a Value Improvement Project was performed. The recommended approach is to provide a 'split stream' Effluent Management Facility (EMF) with an evaporator to support DFLAW. The required modifications for DFLAW facilities are discussed in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing a Low-Activity Waste Direct Feed Capability in the Waste Treatment and Immobilization Plant Project - 15594

The current design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility. The U.S. Department of Energy (DOE) has developed a strategic, phased approach to completing the WTP Project, beginning with feeding some liquid waste from the tank farms to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. To accomplish this, the DOE Office of River Protection (ORP) will construct a new capability outside WTP to remove cesium and solids from the liquid portion of the tank waste before transferring that waste to the LAW Facility. This new capability, referred to as the Low-Activity Waste Pretreatment System, is outside WTP and not included in the project's scope. The primary driver for the Direct-Feed LAW (DFLAW) approach is to enable commissioning of the LAW Facility for low-activity waste processing before the PT and High-Level Waste Facilities are complete and operational. As such, the functions intended to be provided to the LAW Facility by the PT Facility and the common functionality with the High-Level Waste Facility must be refined and modified. The DFLAW approach will provide necessary systems and facilities to replace these enabling PT Facility functions until the PT Facility is completed and commissioned. In February 2014, ORP requested the WTP contractor to develop separate contract modification proposals for completing: (1) the LAW Facility, Balance of Facilities, and Analytical Laboratory work scope in the current contract through hot commissioning in a manner to accommodate a phased start of the WTP mission; and (2) initial planning and design for incorporating a permanent capability to accommodate DFLAW in the WTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

X-ray Diffraction and Multi-Frame Phase Contrast Imaging Diagnostics for IMPULSE at the Advanced Photon Source

The diagnostic needs of any dynamic loading platform present unique technical challenges that must be addressed in order to accurately measure in situ material properties in an extreme environment. The IMPULSE platform (IMPact system for Ultrafast Synchrotron Experiments) at the Advanced Photon Source (APS) is no exception and, in fact, may be more challenging, as the imaging diagnostics must be synchronized to both the experiment and the 60 ps wide x-ray bunches produced at APS. The technical challenges of time-resolved x-ray diffraction imaging and high-resolution multi-frame phase contrast imaging (PCI) are described in this paper. Example data from recent IMPULSE experiments are shown to illustrate the advances and evolution of these diagnostics with a focus on comparing the performance of two intensified CCD cameras and their suitability for multi-frame PCI. The continued development of these diagnostics is fundamentally important to IMPULSE and many other loading platforms and will benefit future facilities such as the Dynamic Compression Sector at APS and MaRIE at Los Alamos National Laboratory.

IMPULSE, x-ray, diffraction, PCI, imaging↗

Solid-State Photomultiplier Development for Radiation Detection

We are pursuing the sensitivity of back-thinned silicon (BT Si) with the gain of an SSPM (Baker 2011). Working in collaboration with Radiation Monitoring Devices, Inc., we are designing and fabricating prototype devices. Our original idea spurred from hybrid designs of advanced image sensors that use the sensitivity of BT Si that is then bump bonded to a CMOS readout device. As shown in the graph below (right), the BT Si has a far superior quantum efficiency (QE) than the standard photocathode response available in photomultiplier tubes (PMTs). Collecting as many scintillation photons as possible is the first objective. There has been major concern that the prototype could not deliver the ~105 electronic gain of a PMT. However, recently developed SSPMs do provide the electronic gain needed. We are now pursuing the design of a BTSSPM. With a smaller footprint, the SSPM can potentially lead to a simple, compact deployment package. Because the SSPM can be pixelated and tiled, we foresee developing an imaging detector. Pinhole imaging of radiation sources is a well-exercised technology. Our implementation of the coded aperture (Marks 2010) imager provides a high throughput pinhole imager. We intend to apply miniature coded apertures to minimal pixel count SSPMs to evaluate image quality.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗