Overview of the fusion nuclear science facility, a credible break-in step on the path to fusion energy
The Fusion Nuclear Science Facility (FNSF) is examined here as part of a two step program from ITER to commercial power plants. This first step is considered mandatory to establish the materials and component database in the real fusion in-service environment before proceeding to larger electricity producing facilities. The FNSF can be shown to make tremendous advances beyond ITER, toward a power plant, particularly in plasma duration and fusion nuclear environment. A moderate FNSF is studied in detail, which does not generate net electricity, but does reach the power plant blanket operating temperatures. The full poloidal Dual Coolant Lead Lithium (DCLL) blanket is chosen, with alternates being the Helium Cooled Lead Lithium (HCLL) and Helium Cooled Ceramic Breeder/Pebble Bed (HCCB/PB). Several power plant relevant choices are made in order to follow the philosophy of targeted technologies. Any fusion core component must be qualified by fusion relevant neutron testing and highly integrated non-nuclear testing before it can be installed on the FNSF in order to avoid the high probability of constant failures in a plasma-vacuum system. A range of missions for the FNSF, or any fusion nuclear facility on the path toward fusion power plants, are established and characterized by several metrics. A conservative physics strategy is pursued to accommodate the transition to ultra-long plasma pulses, and parameters are chosen to represent the power plant regime to the extent possible. An operating space is identified, and from this, one point is chosen for further detailed analysis, with R = 4.8 m, a = 1.2 m, IP = 7.9 MA, BT = 7.5 T, βN Gr = 0.9, fBS = 0.52, q95 = 6.0, H98 ∼1.0, and Q = 4.0. The operating space is shown to be robust to parameter variations. A program is established for the FNSF to show how the missions for the facility are met, with a He/H, a DD and 5 DT phases. The facility requires ∼25 years to complete its DT operation, including 7.8 years of neutron production, and the remaining spent on inspections and maintenance. The DD phase is critical to establish the ultra-long plasma pulse lengths. The blanket testing strategy is examined, and shows that many sectors have penetrations for heating and current drive (H/CD), diagnostics, or Test Blanket Modules (TBMs). The hot cell is a critical facility element in order for the FNSF to perform its function of developing the in-service material and component database. The pre-FNSF R&D is laid out in terms of priority topics, with the FNSF phases driving the time-lines for R&D completion. A series of detailed technical assessments of the FNSF operating point are reported in this issue, showing the credibility of such a step, and more detailed emphasis on R&D items to pursue. These include nuclear analysis, thermo-mechanics and thermal-hydraulics, liquid metal thermal hydraulics, transient thermo-mechanics, tritium analysis, maintenance assessment, magnet specification and analysis, materials assessments, core and scrape-off layer (SOL)/divertor plasma examinations.
Developments of Highly Multiplexed, Multi-chroic Pixels for Balloon-Borne Platforms
We present our work to develop and characterize low thermal conductance bolometers that are part of sinuous antenna multi-chroic pixels (SAMP). We use longer, thinner and meandered bolometer legs to achieve 9 pW/K thermal conductance bolometers. We also discuss the development of inductor–capacitor chips operated at 4 K to extend the multiplexing factor of the frequency domain multiplexing to 105, an increase of 60% compared to the factor currently demonstrated for this readout system. This technology development is motivated by EBEX-IDS, a balloon-borne polarimeter designed to characterize the polarization of foregrounds and to detect the primordial gravity waves through their B-mode signature on the polarization of the cosmic microwave background. EBEX-IDS will operate 20,562 transition edge sensor bolometers spread over 7 frequency bands between 150 and 360 GHz. Balloon and satellite platforms enable observations at frequencies inaccessible from the ground and with higher instantaneous sensitivity. This development improves the readiness of the SAMP and frequency domain readout technologies for future satellite applications.
Scientific Hybrid Realtiy Environments (SHyRE): Bringing Field Work into the Laboratory
The use of analog environments in preparing for future planetary surface exploration is key in ensuring we both understand the processes shaping other planetary surfaces as well as develop the technology, systems, and concepts of operations necessary to operate in these geologic environments. While conducting fieldwork and testing technology in relevant terrestrial field environments is crucial in this development, it is often the case that operational testing requires a time-intensive iterative process that is hampered by the rigorous conditions (e.g. terrain, weather, location, etc.) found in most field environments. Additionally, field deployments can be costly and must be scheduled months in advance, therefore limiting the testing opportunities required to investigate and compare science operational concepts to only once or twice per year.
Exploring cosmic origins with CORE: The instrument
Here, we describe a space-borne, multi-band, multi-beam polarimeter aiming at a precise and accurate measurement of the polarization of the Cosmic Microwave Background. The instrument is optimized to be compatible with the strict budget requirements of a medium-size space mission within the Cosmic Vision Programme of the European Space Agency. The instrument has no moving parts, and uses arrays of diffraction-limited Kinetic Inductance Detectors to cover the frequency range from 60 GHz to 600 GHz in 19 wide bands, in the focal plane of a 1.2 m aperture telescope cooled at 40 K, allowing for an accurate extraction of the CMB signal from polarized foreground emission. The projected CMB polarization survey sensitivity of this instrument, after foregrounds removal, is 1.7 μK∙arcmin. The design is robust enough to allow, if needed, a downscoped version of the instrument covering the 100 GHz to 600 GHz range with a 0.8 m aperture telescope cooled at 85 K, with a projected CMB polarization survey sensitivity of 3.2 μK∙arcmin.
The Fusion Nuclear Science Facility, the Critical Step in the Pathway to Fusion Energy
The proposed Fusion Nuclear Science Facility (FNSF) represents the first facility to enter the complex fusion nuclear regime, and its technical mission and attributes are being developed. The FNSF represents one part of the fusion energy development pathway to the first commercial power plant with other major components being the pre-FNSF research and development, research in parallel with the FNSF, pre-DEMO research and development, and the demonstration power plant (DEMO). Finally, the Fusion Energy Systems Studies group is developing the technical basis for the FNSF in order to provide a better understanding of the demands on the fusion plasma and fusion nuclear science programs.
NEEMO 21: Tools, Techniques, Technologies and Training for Science Exploration
The 21st mission of the National Aeronautics and Space Administration (NASA) Extreme Environment Mission Operations (NEEMO) was a highly integrated operational field test and evaluation of tools, techniques, technologies, and training for science driven exploration during extravehicular activity (EVA). The mission was conducted in July 2016 from the Aquarius habitat, an underwater laboratory, off the coast of Key Largo in the Florida Keys National Marine Sanctuary. An international crew of eight (comprised of NASA and ESA astronauts, engineers, medical personnel, and habitat technicians) lived and worked in and around Aquarius and its surrounding reef environment for 16 days. The integrated testing (both interior and exterior objectives) conducted from this unique facility continues to support current and future human space exploration endeavors. Expanding on the scientific and operational evaluations conducted during NEEMO 20, the 21st NEEMO mission further incorporated a diverse Science Team comprised of planetary geoscientists from the Astromaterials Research and Exploration Science (ARES/XI) Division from the Johnson Space Center, marine scientists from the Department of Biological Sciences at Florida International University (FIU) Integrative Marine Genomics and Symbiosis (IMaGeS) Lab, and conservationists from the Coral Restoration Foundation. The Science Team worked in close coordination with the long-standing EVA operations, planning, engineering, and research components of NEEMO in all aspects of mission planning, development, and execution.
Evolution of stacking faults in substituted nickel hydroxide spherical powders
Not Available
Reducing Subjectivity in Geothermal Exploration Decision Making (Presentation); NREL(National Renewable Energy Laboratory)
Geothermal exploration projects have a significant amount of risk associated with uncertainties encountered in the discovery of the geothermal resource. Two of the largest challenges for increased geothermal deployment are 1) understanding when and how to proceed in an exploration program, and 2) when to walk away from a site. Current methodologies for exploration decision-making are formulatedby subjective expert opinion which can be incorrectly biased by expertise (e.g. geochemistry, geophysics), geographic location of focus, and the assumed conceptual model. The aim of this project is to develop a methodology for more objective geothermal exploration decision making at a given location, including go/no-go decision points to help developers and investors decide when to give up on alocation. In this scope, two different approaches are investigated: 1) value of information analysis (VOIA) which is used for evaluating and quantifying the value of a data before they are purchased, and 2) enthalpy-based exploration targeting based on reservoir size, temperature gradient estimates, and internal rate of return (IRR). The first approach, VOIA, aims to identify the value of aparticular data when making decisions with an uncertain outcome. This approach targets the pre-drilling phase of exploration. These estimated VOIs are highly affected by the size of the project and still have a high degree of subjectivity in assignment of probabilities. The second approach, exploration targeting, is focused on decision making during the drilling phase. It starts with a basicgeothermal project definition that includes target and minimum required production capacity and initial budgeting for exploration phases. Then, it uses average temperature gradient, reservoir temperature estimates, and production capacity to define targets and go/no-go limits. The decision analysis in this approach is based on achieving a minimum IRR at each phase of the project. This secondapproach was determined to be less subjective, since numerical inputs come from the collected data. And it helps to facilitate communication between project managers and exploration geologists in making objective go/no-go decisions throughout the different project phases.
Regulatory and Permitting Information Desktop Toolkit (Fact Sheet)
Overview of DOE's Regulatory and Permitting Information Desktop (RAPID) Toolkit project, providing information on where to go to view documents and who to contact to get involved.
Geothermal Exploration Case Studies on OpenEI (Presentation)
The U.S. Geological Survey (USGS) resource assessment (Williams et al., 2008) outlined a mean 30 GWe of undiscovered hydrothermal resource in the western United States. One goal of the U.S. Department of Energy's (DOE) Geothermal Technology Office (GTO) is to accelerate the development of this undiscovered resource. DOE has focused efforts on helping industry identify hidden geothermal resources to increase geothermal capacity in the near term. Increased exploration activity will produce more prospects, more discoveries, and more readily developable resources. Detailed exploration case studies akin to those found in oil and gas (e.g. Beaumont and Foster, 1990-1992) will give developers central location for information gives models for identifying new geothermal areas, and guide efficient exploration and development of these areas. To support this effort, the National Renewable Energy Laboratory (NREL) has been working with GTO to develop a template for geothermal case studies on the Geothermal Gateway on OpenEI. In 2012, the template was developed and tested with two case studies: Raft River Geothermal Area (http://en.openei.org/wiki/Raft_River_Geothermal_Area) and Coso Geothermal Area (http://en.openei.org/wiki/Coso_Geothermal_Area). In 2013, ten additional case studies were completed, and Semantic MediaWiki features were developed to allow for more data and the direct citations of these data. These case studies are now in the process of external peer review. In 2014, NREL is working with universities and industry partners to populate additional case studies on OpenEI. The goal is to provide a large enough data set to start conducting analyses of exploration programs to identify correlations between successful exploration plans for areas with similar geologic occurrence models.
Platensimycin is a selective FabF inhibitor with potent antibiotic properties
Abstract not provided
Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)
Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.