Search NASA⌕ Search

Engineering topics

Yugo, James

Publications and source records attributed to Yugo, James.

CAAS-3S Radiation Testing for Y-12 and UPF with Godiva-IV

Goals: 1) Qualify the CAAS-3S system to a mixed-field radiation dose and dose rate, and 2) Extend the Y-12 Shielding MCNP Validation to rad-si. This paper represents the efforts of Y-12 and UPF personnel, and their interpretation of the test results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CAAS-3S Radiation Testing for Y-12 and UPF with Godiva-IV

The Y-12 National Security Complex and the Uranium Processing Facility (UPF) selected the Mirion CAAS-3S as the Criticality Accident Alarm System for UPF and for Y-12 facilities replacing their legacy CAAS as part of efforts to extend the facility lifespans. As part of this process, the CAAS-3S system was exposed to a high radiation dose and dose rate during reactor testing with the Godiva-IV fast burst reactor. The reactor testing was designed around preliminary analyses that determined Y-12 and UPF requirements, and simulations of the radiation field within the reactor facility were used to determine reactor operating parameters, CAAS equipment locations, and the design of a neutron shield wall. This paper presents the design and results of the testing, and discusses how the test results were interpreted by criticality safety engineers at Y-12 and UPF.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Need for a Maximum Intensity Accident in ANS 8-Series Standards

Y-12 has installed one CAAS system under the ANS 8.3 framework as a safety significant system, and is in the process of designing, installing, and qualifying another. As a safety significant system, the Y-12 CAAS is required to demonstrate that it is able to perform its function and actuate an alarm when exposed to the radiation from both a Minimum Accident of Concern and a maximum intensity accident. The ANS 8-series standards do not present a maximum accident to be considered, nor do they specify dose rate tolerance requirements, leading CAAS vendors to potentially use other standards that provide inadequate criteria. A maximum intensity accident is proposed, and the effects of this accident on CAAS analysis and the vendor’s equipment qualification are discussed

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗