Operating and Maintaining the JWST Cleanroom attached to JSC's Chamber A during preparations for the OTIS Cryogenic Thermal Vacuum Test

In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.

James Webb Space Telescope↗

Building Automation System Replacement and Improvements during Concurrent Integration and Testing for the Spacecraft Systems Development and Integration Facility

The Spacecraft Systems Development and Integration Facility (SSDIF), the premier cleanroom for NASA Goddard Space Flight Center (GSFC), has gone through multiple iterations of changes to its building automation system (BAS). NASA flight projects require more stringent environmental controls for temperature, humidity, air exchange rates, and pressurization. This led to increasingly difficult circumstances with replacing and improving the BAS during Integration and Testing (I&T) operations. The SSDIF was partially transitioned to a new BAS during November and December of 2023. Transition occurred in a live environment, while regular I&T activities resumed for the Roman Space Telescope. This resulted in the development and execution of a comprehensive method of procedure. Strategies such as sequencing equipment transition, and using temporary controls for critical equipment, avoided detriments to cleanroom environment. While the new BAS was being built, data points on the previous system would become obsolete, leading to data gaps and uncertainties. Critical data points were distinguished and trended on the new system, providing key insights on equipment functionality, while the BAS was completed. Control hunting and environmental deviations were persistent cases with the SSDIF. In some instances, proportional-integral-derivative (PID) tuning was implemented on current logic to bring smooth PID loop hunting. In other situations, controls logic was completely altered by changing setpoints or sequences. This provided greater laminar flow, more stable pressurization, and improved temperature and humidity controls. This paper documents the transitionary procedure to a new BAS, the improvements made, and challenges faced when altering a BAS during I&T operations.