Search NASA⌕ Search

Engineering topics

Zelinski, Shannon J.

Publications and source records attributed to Zelinski, Shannon J..

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Airspace Technology Demonstration 2 (ATD-2): Simulation and Modeling Used in Surface Analysis

This presentation describes how the fast-time simualtion and modeling techniques are used in the development of ATD-2 system, especially for surface traffic data anlaysis. This presentation will answer the following questions: What analytical results are most important to communicate to Industry from ATD-2 simulation? What fast-time simulations are currently in the works, including EOBT quality impact study and benefits/costs assessment of ATD-2?

fast-time simulation↗

Overview of NASA's Air Traffic Management - eXploration (ATM-X) Project

Projected increases in new vehicle types, new missions, and the continual growth in traditional (e.g., airlines, general aviation) aviation will require changes to the current air traffic system, particularly to accommodate the desire of operators to be more involved in air traffic decisions. To address these challenges, the National Airspace System needs to undergo a transformation to a more scalable, flexible, user-focused system that addresses safety and security requirements and resiliency for current and new users. A system designed to integrate modular software services, provided by users, third parties and government for air traffic management functions, will be scalable and more easily allow modernization and for collaboration between users and service providers. ATM-X is responding to NASA's pivot towards integrating projected new, diverse entrants into the NAS, while also leveraging NASA's prior ATM achievements that continue to improve traditional airspace operations. This project is a two-phased approach to conduct research and focused evaluations to assess the feasibility of a service-based approach and to identify critical design considerations to enable airspace access for new entrants, integrated with current traditional operations. Phase 1 research will be conducted to determine what is needed to reach the ATM-X goals based on specific use-cases to enable large-scale, passenger-carrying Urban Air Mobility operations in a metroplex environment, and also to improve traditional operations in the Northeast Region leveraging mature NASA technologies. Some of these evaluations will be conducted in simulations and field activities. Phase 2 will build upon Phase 1 towards more defined, focused research and field demonstrations in real-world environments to integrate multiple elements of a scalable, service-based ATM-X concept.

air traffic management↗

Human Factors Assessment of Disturbances to Scheduled Performance-Based Navigation Arrival Operations

The introduction of Performance-Based Navigation (PBN) specifications to air traffic management has resulted in many benefits during nominal operations, including shorter flight paths, reduced fuel costs, and improved terminal area arrival rates. However, these benefits become less noticeable during off-nominal operations where aircraft are routinely interrupted from staying on PBN procedures due to disturbances such as missed approaches. This human-in-the-loop (HITL) study used multiple types of disturbance events to perturb the arrival schedule. Perturbed schedules were managed with different types of schedule adjustments, including a condition with no adjustments. The study collected data on a host of dependent variables, including human factors measures on controller workload and system performance measures such as schedule nonconformance (nc). Initial analyses showed strong correlations between aggregated controller workload and aggregated nc, as well as benefits of both automatic and manual schedule adjustments for increasing system performance, such as reduced PBN procedure interruptions. The goal of this paper is to further test these initial findings. The results indicated that an increase in schedule nonconformance correlated with an increase in controller workload at specific time intervals, and automated schedule adjustments consistently reduced controller workload associated with nonconformance.

Human factors↗

Arrival Scheduling with Shortcut Path Options and Mixed Aircraft Performance

Previous work introduced the concept of using tactical shortcut options to improve schedule conformance in terminal airspace. When a scheduling point is congested, aircraft are scheduled to longer nominal paths, holding shortcut path options in reserve for tactical use if an aircraft is late, thereby improving the schedule conformance, reducing the required scheduling buffer, and increasing throughput. When the scheduling point is less congested, aircraft may be scheduled to the shorter path with original larger scheduling buffers. Previous work focused on a single generic merge point serving aircraft with uniform arrival precision. This paper extends the previous concept to enhance the performance of time-based arrival management and consider mixed aircraft performance. Aircraft equipped to achieve a high degree of schedule conformance may be scheduled to the shorter path under the same conditions that a less equipped aircraft would be scheduled to the longer path, giving the equipped aircraft an advantage that can be seamlessly integrated into the scheduler. The arrival scheduler with shortcut path options for mixed aircraft performance is applied to a model of first-come first-served terminal metering at Los Angeles International Airport. Whereas clear system benefits were found for tactical shortcut routing and higher percentages of equipped aircraft, very little advantage could be seen for equipped over unequipped aircraft that could be used to incentivize early equipage.

Equipage operations↗

Assessing Resilience of Scheduled Performance-Based Navigation Arrival Operations

This paper assesses the resilience of scheduled Performance-Based Navigation (PBN) arrival operations. Resilience is defined as an ability to return to nominal operations following a schedule perturbation. Results from a Human-in-the- Loop (HITL) experiment that included off-nominal events to perturb the schedule are described. The schedule comes from a precision trajectory-based arrival manager. The experiment collected data regarding the response to perturbed schedules in three conditions, where: 1) a disturbance rejection algorithm made schedule adjustments automatically, 2) a Traffic Management Coordinator (TMC) participant made schedule adjustments manually, or 3) no schedule adjustments were made. Analyses showed that the simulation’s scheduled PBN operations have inherent resilience, recovering from more than half of the perturbed schedules even with no schedule adjustments. Resilience to the same off-nominal events improved with schedule adjustments; an increased proportion of perturbed schedules recovered within the length of operation run, and the average duration of the schedule’s perturbed state decreased. Compared to the manual schedule adjustments condition, a greater number of schedule adjustments occurred for the same off-nominal events in the automated condition. However, perturbed schedules were recovered more frequently and perturbations were less severe in the automated condition. Subjective and objective workload in the manual and the automated schedule adjustment conditions were similar to the no schedule adjustment condition.

Resilience↗