Space Charge Driven Third Order Resonance at AGS Injection
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Zeno, K.
Explore the source record for details and available documents.
Proton bunch intensities in RHIC are planned to be increased from 2 {center_dot} 10{sup 11} to 3 {center_dot} 10{sup 11} protons per bunch to increase the luminosity, together with head-on beam-beam compensation using electron lenses. To study the feasibility of the intensity increase, beam experiments are being performed. Recent experimental results are presented.
The high energy (T = 250 GeV) polarized proton beam experiments performed in RHIC, require high polarization of the beam. In order to preserve the polarization of the proton beam, during the acceleration in the AGS, which is the pre-injector to RHIC, we have installed in AGS two partial helical magnets which minimize the loss of the beam polarization caused by the various intrinsic spin resonances occurring during the proton acceleration. The minimization of the polarization loss during the acceleration cycle, requires that the vertical tune of the AGS is between the values of 8.97 and 8.985 during the acceleration. With the AGS constrained to run at near integer tune {approx}8.980, the perturbations to the beam caused by the partial helical magnets are large and also result in large beta and dispersion waves. To mitigate the adverse effect of the partial helices on the optics of the AGS, we have installed in specified straight sections of the AGS compensation quads and we have also generated a beam bump at the location of the cold partial helix. In this paper we present the beam optics of the AGS which ameliorates the adverse effect of the two partial helices on the beam optics.
Following the Fiscal Year (FY) 2010 (Run-10) Relativistic Heavy Ion Collider (RHIC) Au+Au run, RHIC experiment upgrades sought to improve detector capabilities. In turn, accelerator improvements were made to improve the luminosity available to the experiments for this run (Run-11). These improvements included: a redesign of the stochastic cooling systems for improved reliability; a relocation of 'common' RF cavities to alleviate intensity limits due to beam loading; and an improved usage of feedback systems to control orbit, tune and coupling during energy ramps as well as while colliding at top energy. We present an overview of changes to the Collider and review the performance of the collider with respect to instantaneous and integrated luminosity goals. At the conclusion of the FY 2011 polarized proton run, preparations for heavy ion run proceeded on April 18, with Au+Au collisions continuing through June 28. Our standard operations at 100 GeV/nucleon beam energy was bracketed by two shorter periods of collisions at lower energies (9.8 and 13.5 GeV/nucleon), continuing a previously established program of low and medium energy runs. Table 1 summarizes our history of heavy ion operations at RHIC.
As part of the search for a phase transition or critical point on the QCD phase diagram, an energy scan including 5 different energy settings was performed during the 2010 RHIC heavy ion run. While the top beam energy for heavy ions is at 100 GeV/n and the lowest achieved energy setpoint was significantly below RHICs injection energy of approximately 10 GeV/n, we also provided beams for data taking in a medium energy range above injection energy and below top beam energy. This paper reviews RHIC experience and challenges for RHIC medium energy operations that produced full experimental data sets at beam energies of 31.2 GeV/n and 19.5 GeV/n. The medium energy AuAu run covered two beam energies, both above the RHIC injection energy of 9.8 GeV but well below the standard store energy of 100 GeV (see table 1). The low energy and full energy runs with heavy ions in FY10 are summarized in [1] and [2]. Stochastic Cooling ([3]) was only used for 100 GeV beams and not used in the medium energy run. The efficiency of the transition from 100 GeV operation to 31.2 GeV and then to 19.5 GeV was remarkable. Setup took 32 h and 19 h respectively for the two energy settings. The time in store, defined to be the percentage of time RHIC provides beams in physics conditions versus calendar time, was approximately 52% for the entire FY10 heavy ion run. In both medium energy runs it was well above this average, 68% for 31.5 GeV and 82% for 19.5 GeV. For both energies RHIC was filled with 111 bunches with 1.2 10{sup 9} and 1.3 10{sup 9} ions per bunch respectively.
The Relativistic Heavy Ion Collider (RHIC) operation as the polarized proton collider presents unique challenges since both luminosity(L) and spin polarization(P) are important. With longitudinally polarized beams at the experiments, the figure of merit is LP{sup 4}. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system is installed to improve longitudinal match at injection and to increase luminosity. The beam dump was upgraded to increase bunch intensity. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control is also improved this year. Additional efforts are put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point is chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper. Siberian snakes are essential tools to preserve polarization when accelerating polarized beams to higher energy. At the same time, the higher order resonances still can cause polarization loss. As seen in RHIC, the betatron tune has to be carefully set and maintained on the ramp and during the store to avoid polarization loss. In addition, the orbit control is also critical to preserve polarization. The higher polarization during this run comes from several improvements over last run. First we have a much better orbit on the ramp. The orbit feedback brings down the vertical rms orbit error to 0.1mm, much better than the 0.5mm last run. With correct BPM offset and vertical realignment, this rms orbit error is indeed small. Second, the jump quads in the AGS improved input polarization for RHIC. Third, the vertical tune was pushed further away from 7/10 snake resonance. The tune feedback maintained the tune at the desired value through the ramp. To calibrate the analyzing power of RHIC polarimeters at any energy above injection, the polarized hydrogen jet target runs for every fill with both beams. Based on the known analyzing power, there is very little polarization loss between injection and 100 GeV. An alternative way is to measure the asymmetry at 100 GeV followed by ramping up to 250 GeV and back down to 100 GeV and then to measure the asymmetry again at 100 GeV. If the asymmetry after the down ramp is similar to the measurement before the up ramp, polarization was also preserved during the ramp to 250 GeV. The analyzing power at storage energy can then be extracted from the asymmetries measured at 100 GeV and 250 GeV. The tune and orbit feedbacks are essential for the down ramp to be possible. The polarized proton operation is still going on. We will push bunch intensity higher until reaching the beam-beam limit. The even higher intensity will have to wait for the electron lenses to compensate the beam-beam effect. To understand the details of spin dynamics in RHIC with two snakes, spin simulation with the real magnet fields have been developed recently. The study will provide guidance for possible polarization loss schemes. Further polarization gain will requires a polarized source upgrade; more careful setup jump quads in the AGS to get full benefit; and control emittance in the whole accelerator chain.
The construction and initial commissioning phase of a new heavy ion preinjector was completed at Brookhaven in September, 2010, and the preinjector is now operational. This preinjector, using an EBIS source to produce high charge state heavy ions, provided helium and neon ion beams for use at the NASA Space Radiation Laboratory in the Fall of 2010, and gold and uranium beams are being commissioned during the 2011 run cycle for use in RHIC. The EBIS operates with an electron beam current of up to 10 A, to produce mA level currents in 10-40 {micro}s beam pulses. The source is followed by an RFQ and IH linac to accelerate ions with q/m > 0.16 to an energy of 2 MeV/amu, for injection into the Booster synchrotron. The performance of the preinjector is presented, including initial operational experience for the NASA and RHIC programs.
This note is an overview of issues relating to transverse polarized proton emittance in the Booster and AGS. It also compares the transverse emittance during the FY09 polarized proton run with it during the FY06 run as several changes were made for the FY09 run in an attempt to reduce the transverse emittance coming out of the AGS. The FY06 run is used for comparison because it was relatively long, and it's believed that the performance of the injectors for polarized protons, up until FY09, was best during that run. Over the shutdown just before the FY09 run work was done in LEBT and MEBT to reduce the emittance coming out of the Linac. Measurements of the beam coming out of Linac1 indicate that the horizontal normalized emittance was reduced from 11.0 {pi} to 4.5 {pi}mm mrad, and that the vertical normalized emittance was reduced from 12.1 {pi} to 5.5 {pi} mm mrad going from FY06 to FY09. There were 2 new types of stripping foil installed in the Booster, called descriptively the 'strip' (No.6) and 'stamp' (No.2) foil, both nominally 100 {micro}g/cm{sup 2}. Both foils are composed of a diamond like material, and designed to reduce the number of times the beam goes through the foil. Other than those, there are two standard 100 {micro}g/cm carbon foils (No.3 and 5), and one 200 {micro}g/cm{sup 2} carbon foil (No.4). Of the two 100 {micro}g/cm{sup 2} foils, one has shown some deterioration (No.3) in stripping efficiency. During the FY06 run a standard 100 {micro}g/cm{sup 2} foil was generally used, and during the FY09 run the strip foil was generally used, though the stamp foil was also used for the last 3-4 weeks of the run. Both the FY06 and FY09 runs were about 5 months long, starting in late January, FY06 ending in late June, and FY09 ending in early July. A new injection setup was used for about the last 3 months of FY09, from the beginning of April to the end of the run. This setup uses 1/2 integer stopband correctors with the tunes near, but slightly greater than, 4.5 to distort the {beta} functions at the foil in order to reduce the emittance blowup caused by scattering on the foil. New BtA quad settings, largely based on a MAD model of the BtA line and AGS were used for virtually the entire FY09 run (Feb 5 to the end) in an attempt to improve the matching into the AGS. Since, it has been thought for some time that there is emittance blowup in the vertical due to an injection mismatch. The nominal Linac pulse width was decreased from 400 {micro}s to 300 {micro}s in the latter part of february 09, so the vast majority of the FY09 run used a 300 {micro}s pulse width. The standard pulse width for FY06 was 400 {micro}s. This has some implications for comparing the data from FY06 with that from FY09, but they don't seem insurmountable.
Since the last successful RHIC Au+Au run in 2007 (Run-7), the RHIC experiments have made numerous detector improvements and upgrades. In order to benefit from the enhanced detector capabilities and to increase the yield of rare events in the acquired heavy ion data a significant increase in luminosity is essential. In Run-7 RHIC achieved an average store luminosity of <L> = 12 x 10{sup 26} cm{sup -2} s{sup -1} by operating with 103 bunches (out of 111 possible), and by squeezing to {beta}* = 0.85 m. This year, Run-10, we achieved <L> = 20 x 10{sup 26} cm{sup -2} s{sup -1}, which put us an order of magnitude above the RHIC design luminosity. To reach these luminosity levels we decreased {beta}* to 0.75 m, operated with 111 bunches per ring, and reduced longitudinal and transverse emittances by means of bunched-beam stochastic cooling. In addition we introduced a lattice to suppress intra-beam scattering (IBS) in both RHIC rings, upgraded the RF control system, and separated transition crossing times in the two rings. We present an overview of the changes and the results of Run-10 performance.
During the second half of Run-9, the Relativisitc Heavy Ion Collider (RHIC) provided polarized proton collisions at two interaction points. The spin orientation of both beams at these collision points was controlled by helical spin rotators, and physics data were taken with different orientations of the beam polarization. Recent developments and improvements will be presented, as well as luminosity and polarization performance achieved during Run-9.
The high energy (s{sup 1/2} = 500 GeV) polarized proton beam experiments performed in RHIC, require high polarization of the proton beam. With the AGS used as the pre-injector to RHIC, one of the main tasks is to preserve the polarization of the proton beam, during the beam acceleration in the AGS. The polarization preservation is accomplished by the two partial helical magnets [1,2,3,4,5,6,7] which have been installed in AGS, and help overcome the imperfection and the intrinsic spin resonances which occur during the acceleration of protons. This elimination of the intrinsic resonances is accomplished by placing the vertical tune Q{sub y} at a value close to 8.98, within the spin-tune stop-band created by the snake. At this near integer tune the perturbations caused by the partial helical magnets is large resulting in large beta and dispersion waves. To mitigate the adverse effect of the partial helices on the optics of the AGS, we have introduced compensation quads[2] in the AGS. In this paper we present the beam optics of the AGS which ameliorates this effect of the partial helices.
A dual partial snake scheme has been used for AGS polarized proton operation for several years. It has provided polarized proton beams with 1.5x10{sup 11} protons per bunch and 65% polarization for the RHIC spin program. There is still residual polarization loss due to both snake resonances and horizontal resonances as shown in the data. Several schemes were tested or proposed in the AGS to mitigate the loss, such as putting horizontal tune into the spin tune gap, injection into a accelerating bucket, and tune jump across the horizontal resonances. This paper presents the experiment and simulation results and analyses.
The Booster to AGS (BtA) transfer line was to match both ions and protons into the AGS lattice. For proton beam operation the only constraint on the optics is to define a match to the AGS lattice. For ion operation there are additional constraints introduced by a stripping foil in the upstream part of the transfer line. For polarized proton operation there is the complication that the AGS lattice is distorted by the presence of two partial snake magnets. In the 2008 polarized proton run it was observed that there was a significant optical injection mismatch. Beam experiments were conducted that showed disagreement with the model of the BtA line. In addition, these studies revealed some minor problems with the instrumentation in the line. A new model and more reliable measurements of the transfer line magnet currents have been implemented. Another series of experiments was conducted to test these modifications and to collect a more complete set of data to allow better understanding of the beam dynamics during the transfer and better understanding of the instrumentation. In this paper we will present the results of these experiments and the comparison to the new model of the BtA.
As part of the efforts to increase polarization and luminosity in RHIC during polarized proton operations we have modified the injection optics and stripping foil geometry in the AGS Booster in order to reduce the emittance growth during H{sup -} injection. In this paper we describe the modifications, the injection process, and present results from beam experiments.
No abstract prepared.
Effects of the Booster vertical scraping on the RHIC beam polarization, the RHIC beam emittance, and on the Booster to AGS transfer efficiency and AGS transmission as well, are further studied. In [1], the strong dependence of the RHIC beam polarization and emittance on bunch intensity in proton run 2008 (pp08) is compared with the proton run 2006 (pp06), where the dependence is much weaker. The setting in the AGS Booster, mainly the vertical scraping, is suspected to having played a role in the different patterns in the two runs. In this note, we further study the effects of the Booster vertical scraping on the RHIC beam polarization, and on the RHIC beam emittance as well. With the improvement of the RHIC bunch intensity in mind, the Booster scraping effects on the Booster to AGS transfer (BtA) efficiency and the AGS transmission are also studied. For simplicity and to be more useful, only the RHIC fills after the one-week shutdown in pp06 and the fills using the AGS User 2 in pp08 are shown. For these fills, the machine settings in AGS are similar in pp06 and pp08 runs. Furthermore, this setting might be used for next polarized proton run, at least at the beginning of the run.
The Booster to AGS (BtA) transfer line [Ref for BtA line] transports the beam bunches from the AGS-Booster to the AGS synchrotron, and also matches the beam parameters ({beta}{sub x,y}, {alpha}{sub x,y}) and dispersion functions ({eta}{sub x,y}, {eta}{prime}{sub x,y}) of the transported beam to the corresponding quantities of the circulating beam in AGS, at the AGS injection point. In this technical note we describe in details, the calculations of the matching procedure of the BtA line to the bare-AGS, and provide magnet settings for the MAD-model of the BtA transfer line which is 'matched' to the bare-AGS. In a separate but more concise technical note (Part II) we will present results on the beam optics of the BtA beam line which is 'matched' to the AGS with two helical snakes.
During Run-8, the Relativistic Heavy Ion Collider (RHIC) provided collisions of spin-polarized proton beams at two interaction regions. Physics data were taken with vertical orientation of the beam polarization, which in the 'Yellow' RHIC ring was significantly lower than in previous years. We present recent developments and improvements as well as the luminosity and polarization performance achieved during Run-8, and we discuss possible causes of the not as high as previously achieved polarization performance of the 'Yellow' ring.