Search NASA⌕ Search

Engineering topics

Zhai, Y.

Publications and source records attributed to Zhai, Y..

Magnets for a Muon Collider—Needs and Plans

We describe the magnet challenges for a Muon Collider, an exciting option considered for the future of particle physics at the energy frontier. Starting from the comprehensive work performed by the US Muon Accelerator Program, we have reviewed the performance specifications dictated by beam physics and the operating conditions to satisfy the accelerator needs. Among the many magnets that make up a muon collider, we have identified four systems that represent well the envelope of challenges: the target and capture solenoid, the final cooling solenoid, the accelerator dipoles and the collider dipoles. These systems provide focus for the development of novel concepts, largely based on HTS for reasons of performance, cost and sustainability. After giving a consolidated overview of the needs for the magnet systems, we describe here the basic technology options considered, and the plan for design and development activities.

43 PARTICLE ACCELERATORS↗

Fusion pilot plant performance and the role of a sustained high power density tokamak

Here, recent U.S. fusion development strategy reports all recommend that the U.S. should pursue innovative science and technology to enable construction of a fusion pilot plant (FPP) that produces net electricity from fusion at low capital cost. Compact tokamaks have been proposed as a means of potentially reducing the capital cost of a FPP. However, compact steady-state tokamak FPPs face the challenge of integrating a high fraction of self-driven current with high core confinement, plasma pressure, and high divertor parallel heat flux. This integration is sufficiently challenging that a dedicated sustained-high-power-density (SHPD) tokamak facility is proposed by the U.S. community as the optimal way to close this integration gap. Performance projections for the steady-state tokamak FPP regime are presented and a preliminary SHPD device with substantial flexibility in lower aspect ratio (A = 2–2.5), shaping, and divertor configuration to narrow gaps to an FPP is described.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Concept Design and Analysis of the Magnet System of the Sustained High Power Density Tokamak Facility

A recent National Academy study recommended a next-step sustained high power density (SHPD) facility for the United States that can be a bridge to a compact fusion pilot plant. A design has been initiated to investigate a possible SHPD non-deuterium-tritium device that builds upon recent low aspect ratio tokamak studies. Here, a 1.2-m device with a 2.4 aspect ratio has been chosen to evaluate physics performance goals within a double-null plasma machine arrangement centered on three component features: high current density toroidal field (TF) and central ohmic heating/poloidal field (PF) coils, liquid metal divertor/first wall systems, and the integration of a limited set of outboard dual-coolant lead lithium test blankets that can be maintained within a vertical maintenance approach.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Overview of the fusion nuclear science facility, a credible break-in step on the path to fusion energy

The Fusion Nuclear Science Facility (FNSF) is examined here as part of a two step program from ITER to commercial power plants. This first step is considered mandatory to establish the materials and component database in the real fusion in-service environment before proceeding to larger electricity producing facilities. The FNSF can be shown to make tremendous advances beyond ITER, toward a power plant, particularly in plasma duration and fusion nuclear environment. A moderate FNSF is studied in detail, which does not generate net electricity, but does reach the power plant blanket operating temperatures. The full poloidal Dual Coolant Lead Lithium (DCLL) blanket is chosen, with alternates being the Helium Cooled Lead Lithium (HCLL) and Helium Cooled Ceramic Breeder/Pebble Bed (HCCB/PB). Several power plant relevant choices are made in order to follow the philosophy of targeted technologies. Any fusion core component must be qualified by fusion relevant neutron testing and highly integrated non-nuclear testing before it can be installed on the FNSF in order to avoid the high probability of constant failures in a plasma-vacuum system. A range of missions for the FNSF, or any fusion nuclear facility on the path toward fusion power plants, are established and characterized by several metrics. A conservative physics strategy is pursued to accommodate the transition to ultra-long plasma pulses, and parameters are chosen to represent the power plant regime to the extent possible. An operating space is identified, and from this, one point is chosen for further detailed analysis, with R = 4.8 m, a = 1.2 m, IP = 7.9 MA, BT = 7.5 T, βN Gr = 0.9, fBS = 0.52, q95 = 6.0, H98 ∼1.0, and Q = 4.0. The operating space is shown to be robust to parameter variations. A program is established for the FNSF to show how the missions for the facility are met, with a He/H, a DD and 5 DT phases. The facility requires ∼25 years to complete its DT operation, including 7.8 years of neutron production, and the remaining spent on inspections and maintenance. The DD phase is critical to establish the ultra-long plasma pulse lengths. The blanket testing strategy is examined, and shows that many sectors have penetrations for heating and current drive (H/CD), diagnostics, or Test Blanket Modules (TBMs). The hot cell is a critical facility element in order for the FNSF to perform its function of developing the in-service material and component database. The pre-FNSF R&D is laid out in terms of priority topics, with the FNSF phases driving the time-lines for R&D completion. A series of detailed technical assessments of the FNSF operating point are reported in this issue, showing the credibility of such a step, and more detailed emphasis on R&D items to pursue. These include nuclear analysis, thermo-mechanics and thermal-hydraulics, liquid metal thermal hydraulics, transient thermo-mechanics, tritium analysis, maintenance assessment, magnet specification and analysis, materials assessments, core and scrape-off layer (SOL)/divertor plasma examinations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The development of a Sustained High Power Density (SHPD) facility

A Sustained High Power Density (SHPD) facility is being planned within the U.S. as a non DT device which can be a bridge to a Compact Fusion Pilot Plant (CFPP) DT operated facility with the future capacity to produce a levelised cost of electricity at a rate competitive with current power generating systems. To accomplish this a review of ITER cost data and recent next step physics/engineering studies that promoted technology development, physics enhancements and innovated configuration improvements that increase operating availability have been injected into a proposed PPPL SHPD design. Much of the physics and engineering design basis for this effort centers on a series of ST studies carried out in recent years attempting to maximize the low aspect ratio (AR) ST performance within realistic engineering constraints of this compact fusion device. One issue found in the low AR design is the lack of volt-seconds generated by a small central solenoid that resides in the available space left after sizing the TF structure to support the high current density/HTS TF coil. Although not required in a larger pilot plant device, a solenoid wrapped around the plasma side of the SC TF coil was considered for the small low aspect ratio SHPD device. Adding a solenoid to the plasma side of the TF imposes a major change to the device configuration – a change which has been found to have cost and assembly issues when compared with an OH solenoid located at the machine center. Finally, the inclusion of a liquid metal first wall divertor system, the integration of local pairs of outboard DCLL blanket segments and a summary of physics performance conditions will be presented.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗