Search NASA⌕ Search

Engineering topics

Zhang, S. Y.

Publications and source records attributed to Zhang, S. Y..

At least 19 records

Even-even Nd isotopes in an S D -pair shell model

Nucleon pair shell model truncated to SD collective pair subspace (SDPSM) was applied to study the properties of the low-lying states of the even-even 144–156 Nd isotopes. It is found that, within the M scheme, the systems with the number N ν = 7 of neutron pairs (or the number N π = 7 of proton pairs) can be studied in the SDPSM for the first time. The results show that the properties of the low-lying states of the even-even Nd isotopes can be reproduced approximately, and the even-even 144–15 6Nd isotopes may be a good candidate for the first-order shape phase transition.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

eRHIC Beam Scrubbing

We propose using beam scrubbing to mitigate the electron cloud effect in the eRHIC. The bunch number is adjusted below the heat load limit, then it increases with the reduced secondary electron yield resulted from the beam scrubbing, up to the design bunch number. Since the electron density threshold of beam instability is lower at the injection, a preliminary injection scrubbing should go first, where large chromaticity can be used to keep the beam in the ring for scrubbing. After that, the beam can be ramped to full energy, allowing physics scrubbing. Simulations demonstrated that with beam scrubbing in a reasonable period of time, the eRHIC baseline design is feasible.

43 PARTICLE ACCELERATORS↗

Recombination monitor

This is a brief report on LEReC recombination monitor design considerations. The recombination produced Au 78+ ion rate is reviewed. Based on this two designs are discussed. One is to use the large dispersion lattice. It is shown that even with the large separation of the Au 78+ beam from the Au 79+ beam, the continued monitoring of the recombination is not possible. Accumulation of Au 78+ ions is needed, plus collimation of the Au79+ beam. In another design, it is shown that the recombination monitor can be built based on the proposed scheme with the nominal lattice. From machine operation point of view, this design is preferable. Finally, possible studies and the alternative strategies with the basic goal of the monitor are discussed.

43 PARTICLE ACCELERATORS↗

RHIC operation with asymmetric collisions in 2015

To study low-x shadowing/saturation physics as well as other nuclear effects [1], [2], proton-gold (p-Au, for 5 weeks) and proton-Aluminum (p-Al, for 2 weeks) collisions were provided for experiments in 2015 at the Relativistic Heavy Ion Collider (RHIC), with polarized proton beam in the Blue ring and Au/Al beam in the Yellow ring. The special features of the asymmetric run in 2015 will be introduced. The operation experience will be reviewed as well in the report.

43 PARTICLE ACCELERATORS↗

RHIC polarized proton-proton operation at 100 GeV in Run 15

The first part of RHIC Run 15 consisted of ten weeks of polarized proton on proton collisions at a beam energy of 100 GeV at two interaction points. In this paper we discuss several of the upgrades to the collider complex that allowed for improved performance. The largest effort consisted in commissioning of the electron lenses, one in each ring, which are designed to compensate one of the two beam-beam interactions experienced by the proton bunches. The e-lenses raise the per bunch intensity at which luminosity becomes beam-beam limited. A new lattice was designed to create the phase advances necessary for a beam-beam compensation with the e-lens, which also has an improved off-momentum dynamic aperture relative to previous runs. In order to take advantage of the new, higher intensity limit without suffering intensity driven emittance deterioration, other features were commissioned including a continuous transverse bunch-by-bunch damper in RHIC and a double harmonic RF cature scheme in the Booster. Other high intensity protections include improvements to the abort system and the installation of masks to intercept beam lost due to abort kicker pre-fires.

43 PARTICLE ACCELERATORS↗

RHIC Au beam in Run 2014

Au beam at the RHIC ramp in run 2014 is reviewed together with the run 2011 and run 2012. Observed bunch length and longitudinal emittance are compared with the IBS simulations. The IBS growth rate of the longitudinal emittance in run 2014 is similar to run 2011, and both are larger than run 2012. This is explained by the large transverse emittance at high intensity observed in run 2012, but not in run 2014. The big improvement of the AGS ramping in run 2014 might be related to this change. The importance of the injector intensity improvement in run 2014 is emphasized, which gives rise to the initial luminosity improvement of 50% in run 2014, compared with the previous Au-Au run 2011. In addition, a modified IBS model, which is calibrated using the RHIC Au runs from 9.8 GeV/n to 100 GeV/n, is presented and used in the study.

43 PARTICLE ACCELERATORS↗

Comments on Injector Proton Beam Study in Run 2014

During the entire period of injector proton study in run 2014, it seems that the beam transverse emittance out of Booster is larger than that in run 2013. The emittance measured at the BtA transfer line and also the transmission from Booster late to AGS late are presented for this argument. In addition to this problem, it seems that the multiturn Booster injection, which defines the transverse emittance, needs more attention. Moreover, for high intensity operations, the space charge effect may be already relevant in RHIC polarized proton runs. With the RHIC proton intensity improvement in the next several years, higher Booster input intensity is needed, therefore, the space charge effect at the Booster injection and early ramp may become a new limiting factor.

43 PARTICLE ACCELERATORS↗

Calculations of single crystal elastic constants for yttria partially stabilised zirconia from powder diffraction data

Yttria Stabilised Zirconia (YSZ) is a tough, phase-transforming ceramic that finds use in a wide range of commercial applications from dental prostheses to thermal barrier coatings. Micromechanical modelling of phase transformation can deliver reliable predictions in terms of the influence of temperature and stress. However, models must rely on the accurate knowledge of single crystal elastic stiffness constants. Some techniques for elastic stiffness determination are well-established. The most popular of these involve exploiting frequency shifts and phase velocities of acoustic waves. However, the application of these techniques to YSZ can be problematic due to the micro-twinning observed in larger crystals. Here, we propose an alternative approach based on selective elastic strain sampling (e.g., by diffraction) of grain ensembles sharing certain orientation, and the prediction of the same quantities by polycrystalline modelling, for example, the Reuss or Voigt average. The inverse problem arises consisting of adjusting the single crystal stiffness matrix to match the polycrystal predictions to observations. In the present model-matching study, we sought to determine the single crystal stiffness matrix of tetragonal YSZ using the results of time-of-flight neutron diffraction obtained from an in situ compression experiment and Finite Element modelling of the deformation of polycrystalline tetragonal YSZ. The best match between the model predictions and observations was obtained for the optimized stiffness values of C11 = 451, C33 = 302, C44 = 39, C66 = 82, C12 = 240, and C13 = 50 (units: GPa). Considering the significant amount of scatter in the published literature data, our result appears reasonably consistent.

36 MATERIALS SCIENCE↗

Temperature dependence of the magnetostriction in polycrystalline PrFe{sub 1.9} and TbFe{sub 2} alloys: Experiment and theory

A remarkable magnetostriction λ{sub 111} as large as 6700 ppm was found at 70 K in PrFe{sub 1.9} alloy. This value is even larger than the theoretical maximum of 5600 ppm estimated by the Steven's equivalent operator method. The temperature dependence of λ{sub 111} for PrFe{sub 1.9} and TbFe{sub 2} alloys follows well with the single-ion theory rule, which yields giant estimated λ{sub 111} values of about 8000 and 4200 ppm for PrFe{sub 1.9} and TbFe{sub 2} alloys, respectively, at 0 K. The easy magnetization direction of PrFe{sub 1.9} changes from [111] to [100] as temperature decreases, which leads to the abnormal decrease of the magnetostriction λ. The rare earth sublattice moment increases sharply in PrFe{sub 1.9} alloy with decreasing temperature, resulting in the remarkably largest estimated value of λ{sub 111} at 0 K according to the single-ion theory.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

RHIC Proton Luminosity and Polarization Improvement

The RHIC proton beam polarization can be improved by raising the Booster scraping, which also helps to reduce the RHIC transverse emittance, and therefore to improve the luminosity. By doing this, the beam-beam effect would be enhanced. Currently, the RHIC working point is constrained between 2/3 and 7/10, the 2/3 resonance would affect intensity and luminosity lifetime, and the working point close to 7/10 would enhance polarization decay in store. Run 2013 shows that average polarization decay is merely 1.8% in 8 hours, and most fills have the luminosity lifetime better than 14 hours, which is not a problem. Therefore, even without beam-beam correction, there is room to improve for RHIC polarization and luminosity. The key to push the Booster scraping is to raise the Booster input intensity; for that, two approaches can be used. The first is to extend the LINAC tank 9 pulse width, which has been successfully applied in run 2006. The second is to raise the source temperature, which has been successfully applied in run 2006 and run 2012.

43 PARTICLE ACCELERATORS↗

RHIC 100 GeV Polarized Proton Luminosity

A big problem in RHIC 100 GeV proton run 2009 was the significantly lower luminosity lifetime than all previous runs. It is shown in this note that the beam intensity decay in run 2009 is caused by the RF voltage ramping in store. It is also shown that the beam decay is not clearly related to the beam momentum spread, therefore, not directly due to the 0.7m. β* Furthermore, the most important factor regarding the low luminosity lifetime is the faster transverse emittance growth in store, which is also much worse than the previous runs, and is also related to the RF ramping. In 100 GeV proton run 2012a, the RF ramping was abandoned, but the β* was increased to 0.85m, with more than 20% loss of luminosity, which is not necessary. It is strongly suggested to use smaller β* in 100 GeV polarized proton run 2015/2016

43 PARTICLE ACCELERATORS↗

Deformation mechanisms of a 20Mn TWIP steel investigated by in situ neutron diffraction and TEM

The deformation mechanisms and associated microstructure changes during tensile loading of an annealed twinning-induced plasticity (TWIP) steel with the chemical composition of Fe–20Mn–3Si–3Al–0.045C (wt.%) were systematically investigated using in situ time-of-flight (TOF) neutron diffraction in combination with postmortem transmission electron microscopy (TEM). The initial microstructure of the investigated alloy consists of equiaxed austenitic grains with the initial α´-phase of ~7% in volume. In addition to dislocation slip, twinning and two kinds of martensitic transformations from the austenite to α´- and epsilon martensites were observed as the main deformation modes during the tensile deformation. In situ neutron diffraction provides a powerful tool to establish the deformation mode map for elucidating the role of different deformation modes in different strain regions. The critical stress is 520 MPa for the martensitic transformation from the austenite to α´-martensite, whereas a higher stress (>600 MPa) is required for actuating the deformation twin and/or the martensitic transformation from -martensite. Both epsilon- and α´-martensites act as the hard phases whereas mechanical twinning contributes to both strength and ductility of the studied steel. TEM observations confirmed that the twinning process was facilitated by the parent grains orientated with <111> or <110> parallel to the loading direction. The nucleation and growth of twins are attributed to the pole and self-generation formation mechanisms, as well as the stair-rod cross-slip mechanism.

in situ neutron diffraction↗

Beam-beam effects with stochastic cooling in the 2012 RHIC 100 GeV heavy ion run

The 3-D stochastic cooling has been implemented in RHIC for the first time in the 2012 heavy ion run. In the U-U run, the U beam’s transverse emittances were cooled from initially about 13.5 mm.mrad down to 2.5 mm.mrad. The beam-beam parameters reached a maximum of -0.005. In the Cu-Au run, due to the unbalanced transverse beam sizes of the Cu and Au beams in the first several hours at the store, the Cu beam lifetime was significantly reduced by the beam-beam interaction. To maintain the Cu beam lifetime and to maximize the integrated luminosity, we intentionally reduced the cooling rate for the Au beam until the Cu beam got cooled. In this article, we review the beambeam effects in the 2012 RHIC heavy ion run and carry out numerical simulations to interpret the observations.

43 PARTICLE ACCELERATORS↗

EBIS Au Beam at RHIC

With the EBIS beam and current setting in injector chain, the Au beam at RHIC injection is different from the Tandem beam. The transverse and longitudinal emittance of the EBIS Au beam at RHIC is presented in this note. For further improvements of EBIS and injector settings, this can be used to compare or to justify. Also, based on Run 2012 conditions, the luminosity optimization in RHIC is of interest to study.

43 PARTICLE ACCELERATORS↗