Search NASA⌕ Search

Engineering topics

Zhang, Zhuanfang

Publications and source records attributed to Zhang, Zhuanfang.

Aquifer Injection Modeling (AIM) Toolbox User Guide

The Aquifer Injection Modeling Toolbox (“AIM Toolbox”) software was developed by the Pacific Northwest National Laboratory (PNNL) for the U.S. Environmental Protection Agency’s (EPA) to provide a collection of analytical solutions suitable for evaluating the potential extent of the area impacted by subsurface injection operations. Subsurface injection operations are regulated under the EPA’s Underground Injection Control (UIC) program and are typically related to oil/gas development, waste disposal, or subsurface mining or storage. The analytical algorithms provided in the AIM Toolbox each have different approaches/assumptions/focus with respect to the nature and processes in subsurface and the nature of the injection operations. Collectively the set of analysis algorithms provides a broader evaluation of the area that can potentially be impacted by an injection operation. By providing estimates for the injectate plume extent, the software supports technical aspects of planning, evaluation, and overseeing injection activities. That is, the results help assess when further regulatory controls (e.g., monitoring, reporting) may be required and, in the case of disposal into an underground source of drinking water, the extent of the impacted area would require exemption from protection under the Safe Drinking Water Act. The AIM Toolbox software is available as a single-page web application, providing an interface to provide the necessary inputs, and both chart and map panes for visualizing the results. This User Guide describes the AIM Toolbox software, information required, user interactions, and the underlying basis of the calculations.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of Containment and Geomechanical Risks at Integrated Mid-Content Stacked Carbon Storage Hub Sites

The U.S. Department of Energy is leading the development of CCS through collaborative projects and programs to not only develop and demonstrate the technology but to also quantify the risks and provide tools that site operators can use to develop a site-specific understanding of their risk to enable successful project operations. This report summarizes results and findings from the application of risk-assessment tools to an industrial-scale Geologic Carbon Storage (GCS) project. Specifically, we applied the National Risk Assessment Partnership’s (NRAP) Open Integrated Assessment Model (NRAP-Open-IAM) and State of Stress Assessment Tool (SOSAT) to two candidate sites being considered for storage by the Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-Hub) project team. These sites, Sleepy Hollow Field in Nebraska and Patterson Field in Kansas, have historical oil and gas production and thus are attractive candidates to store the 50 million metric tons (Mt), which is the CarbonSAFE objective. Because these sites have historical operations, they have a significant number of existing wells that pose a risk for well leakage. Additionally, the storage formations will undergo significant pore pressure perturbation (i.e., increase due to CO 2 injection). Hence, we have selected the two NRAP tools best suited to study the risks associated with well leakage and geomechanical risks. The objective of the study was not only to assess the risk at the site, but to also improve the NRAP tools through application using real site data on an ongoing project.

54 ENVIRONMENTAL SCIENCES↗

A New Capability of E4D For 3D Parallel Joint Inversion of DC Resistivity And Traveltime Data on Unstructured Mesh

A major challenge in interpreting geophysical data is how to derive consistent three-dimensional (3D) earth models of different physical properties from spatially and temporally limited measurements. Joint inversion with cross-gradient constraints is an approach to find such models by imposing structural similarities between different physical parameters. We have developed a parallel distributed-memory joint inversion code for direct-current (DC) resistivity and traveltime data using the cross-gradient constraint on unstructured mesh. The code utilizes existing E4D framework for parallel forward simulation, distributed storage and computation of the Jacobian matrix of forward operator, and parallel execution of matrix-vector multiplication during inversion. Besides, the joint inversion is solved by nonlinear conjugate gradient algorithm parallelized for DC resistivity and traveltime data. The joint inversion capability of E4D was tested using synthetic data from cross-borehole DC resistivity and traveltime data. The results indicate that the shape and size of the anomalies from the joint inversion are more reliable than those from separate inversions.

58 GEOSCIENCES↗

Groundwater characterization and monitoring at a complex industrial waste site using electrical resistivity imaging

A contaminated industrial waste site in Washington State (USA) containing buried, metallic-waste storage tanks, pipes, and wells, was evaluated to determine the feasibility of monitoring groundwater remediation activities associated with an underlying perched aquifer system using electrical resistivity tomography. The perched aquifer, located ~65 m below ground surface and ~10 m above the regional water table, contains high concentrations of nitrate, uranium, and other contaminants of concern from past tank leaks and intentional releases of wastes to surface disposal sites. The extent of the perched water aquifer is not well known, and the effectiveness of groundwater extraction for contaminant removal is uncertain, so supplemental characterization and monitoring technologies are being evaluated. Numerical simulations of subsurface flow and contaminant transport were performed with a highly resolved model of the hydrogeologic system and waste site infrastructure, and these simulations were used as the physical basis for electrical resistivity tomography modeling. The modeling explicitly accounted for metallic infrastructure at the site. The effectiveness of using surface electrodes versus surface and horizontal subsurface electrodes, for imaging groundwater extraction from the perched water aquifer, was investigated. Although directional drilling is a mature technology, its use for electrode emplacement in the deep subsurface under a complex industrial waste site via horizontal wells has not yet been demonstrated. Results from this study indicate that using horizontal subsurface electrode arrays could significantly improve the ability of electrical resistivity tomography to image deep subsurface features and monitor remediation activities under complex industrial waste sites.

54 ENVIRONMENTAL SCIENCES↗

Algebraic expressions for estimating the impact depths of a surface barrier over a homogeneous soil

Engineered surface barriers are used to isolate subsurface contaminants for effective long-term containment of municipal solid waste, other nonhazardous solid and liquid waste, hazardous and toxic wastes, and radioactive waste. The impact depths of a surface barrier are affected by the pre-barrier recharge rate and the properties of the soil beneath the barrier. In this paper, the pore-size-specific (PSS) water velocity is defined and an algebraic expression of PSS velocity is derived based on the stream tube concept and the Brooks and Corey hydraulic retention model. Algebraic expressions are developed to estimate drainage velocities and barrier impact depths after the emplacement of a surface barrier. Four impact depth terms are used to convey the protective effect: drainage front, average drainage, the location with 50% impact, and drainage tail. The drainage front depth is the deepest point at which the barrier has a detectable impact at a specific time (also called the near zero-impact depth). The average-impact depth is the depth at which average drainage occurs. At the 50% impact depth, the water flux rate is reduced by half because of the surface barrier. Lastly, the drainage tail depth (also called the full-impact depth) is the deepest depth at which the water conditions above it are in equilibrium with the barrier. The algebraic expressions show that the average-impact depth is no more than 1/3 of near zero-impact depth, while the 50% impact depth is slightly larger than 1/2 of the near zero-impact depth. The full-impact depth, depending on the final recharge rate from the surface barrier, is usually much smaller than the other impact depths. These differences lead to a very large transition zone beneath a surface barrier. Numerical simulations were conducted to replicate the same conditions. The numerical results corroborated the analytical models by predicting very similar water content profiles and near zero-, average-, 50%, and full-impact depths. The algebraic expressions provided in this paper are useful for quickly identifying sites where the depth of the existing contaminants could be beyond the protection of a surface barrier.

54 ENVIRONMENTAL SCIENCES↗

Numerical Investigation of the Electrical Resistivity Tomography for Detecting the Waste Zone beneath an Engineered Surface

Surface barriers are an integral part of waste site remediation that are needed to minimize further contamination spread, allow time for additional radionuclide decay, and decrease risks to workers and the environment. Depending on the type of waste, the design life of a surface barrier varies from decades to millennia. The performance and impacts of surface barriers must be monitored beyond the life of most monitoring instruments; hence, long-term monitoring technologies are needed that can non-intrusively assess barrier impacts both in the near surface and to large depths. Innovative geophysical methods such as the electrical resistivity tomography (ERT) are capable of non-intrusively detecting the distribution of soil wetness and/or contaminant plumes in the soil. However, the application of geophysical methods in monitoring a surface barrier system has been very limited because a surface barrier is often composed of multiple components made of natural (e.g., soil, rocks, asphalt) and manufactured (e.g., plastic, metal) materials. In this study, the E4D numerical simulator, developed at Pacific Northwest National Laboratory for inverting the ERT survey data, was used to evaluate the configuration of electrodes for optimized ERT monitoring of waste zone below a surface barrier. The results indicate that, for high-quality mapping of the conditions below the surface barrier, the ERT method requires that some of the electrodes be installed either beneath the surface barrier or in boreholes around the barrier. In reality, for a surface barrier that is being constructed, some electrodes may be installed beneath the non-conductive layer of the surface barrier before or during barrier construction. For a surface barrier that has already been constructed, some electrodes can be installed in a few vertical boreholes around the barrier boundary.

Zhang, Zhuanfang↗

Monitoring the Prototype Hanford Barrier – Fiscal Year 2018 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2-acre) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State. The PHB construction was part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test was an enhanced precipitation stress test from water year 1995 (WY95) to WY97 to determine barrier response to extreme precipitation events. A controlled fire test was conducted in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Perched Water Post-Extraction Remedy Technologies: Interim Status Report

In the 200-DV-1 Operable Unit at Hanford, a perched water zone is located in a fine-grained unit a few meters above the water table within the B, BX, and BY Tank Farms area. The perched water contains elevated concentrations of uranium (U), technetium-99 ( 99 Tc), and nitrate (NO 3 ), and serves as a future flux of contaminated water into the groundwater. Currently, a pumping system is used for removal of contaminant mass from the perched water zone to decrease the total contaminant mass transported into the groundwater. As the perched water zone is desaturated through pumping, removal of the contaminated perched water will become more difficult over time. Water extraction cannot remove all of the contaminant mass from this zone, nor can it stop the recharge-driven flux of remaining contaminants toward the groundwater because the flux will continue under unsaturated conditions. Thus, contamination that will remain after pumping needs to be addressed with post-extraction mitigation approaches along with appropriate monitoring and selection of a suitable remediation endpoint.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Objective PDF-Shaping-Based Economic Dispatch for Power Systems with Intermittent Generation Sources via Simultaneous Mean and Variance Minimization

With the ever increased penetration of renewables in power grid, economic power dispatch faces a challenge in terms of min-imizing the generation cost which is increasingly affected by random factors and constraints subjected to random inputs. In this context, the cost functions are random for which the widely used mean value based minimization can only achieve limited profit gain. Indeed, as the probability density function (PDF) is a comprehensive measure of characteristics of any random varia-bles, the desired optimization should address the shaping of the PDF of the generation cost function rather just its mean value. Through a simple case study, this paper firstly reveals the long tail PDF shape of the cost function when the traditional mean-value based optimization is used. This is then followed by the de-velopment of a novel PDF-shaping-based method that optimizes both the mean and variance of the PDF of the cost function. It has been shown that the proposed approach can reshape the PDF of the generation cost function so as to make it as left and as narrow as possible, leading to a significant low risk for high generation cost. Simulation tests have been included to show the effectiveness of the proposed approach and encouraging results have been obtained.

intermittent generation sources, uncertainties, PD↗

Monitoring the Prototype Hanford Barrier – Fiscal Year 2017 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2-acre) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State. The PHB construction was part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test was an enhanced precipitation stress test during water year 1995 (WY95) to WY97 to determine barrier response to extreme precipitation events. A controlled fire test was conducted in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation.

54 ENVIRONMENTAL SCIENCES↗

Monitoring the Prototype Hanford Barrier – Fiscal Year 2017 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2 acres) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State as part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test included an enhanced precipitation stress test during the water years 1995 to 1997 to determine barrier response to extreme precipitation events and a controlled fire test in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Drainage from the Riprap Side Slope of a Surface Barrier

Surface barriers designed to isolate underground nuclear waste in place are expected to function for at least 1000 years. To achieve this long design life, such barriers need to be protected with side slopes against wind- and water-induced erosion and damage by natural or human activities. However, the side slopes are usually constructed with materials coarser than the barrier. Their hydrological characteristics must be understood so that any drainage from them is considered in the barrier design and will not compromise the barrier function. The Prototype Hanford Barrier, an evapotranspiration-capillary (ETC) barrier, was constructed in 1994 at the Hanford Site in southeastern Washington state, with a gravel side slope and a riprap side slope. The soil water content in the gravel side slope and drainage from both side slopes have been monitored since the completion of construction. The monitoring results show that under natural precipitation the annual drainage rates from the two types of side slopes were very similar and about 5 times the typical recharge from local soil with natural vegetation and 40 times the barrier design criterion. The higher recharge from the side slopes results in some of the drainage migrating laterally to the region beneath the ETC barrier. This edge effect of the enhanced drainage was evaluated for a period of 1000 years by numerical simulation. The edge effect was quantified by the amount of water across the barrier edges and the affecting distance of the barrier edges. These results indicate that design features can be adjusted to reduce the edge effect when necessary.

Alternative Cover↗

Minimizing Uncertainties Impact in Decision Making with an Applicability Study for Economic Power Dispatch

This report summaries the work performed under the LDRD project on the preliminary study on knowledge automation, where specific focus has been made on the investigation of the impact of uncertainties of human decision making onto the optimization of the process operation. At first the statistics on signals from the Brain-Computing Interface (BCI) is analyzed so as to obtain the uncertainties characterization of human operators during the decision making phase using the electroencephalogram (EEG) signals. This is then followed by the discussions of an architecture that reveals the equivalence between optimization and closed loop feedback control design, where it has been shown that all the optimization problems can be transferred into the control design problem for closed loop systems. This has led to a “closed loop” framework, where the structure of the decision making is shown to be subjected to both process disturbances and controller’s uncertainties. The latter can well represent the uncertainties or randomness occurred during human decision making phase. As a result, a stochastic optimization problem has been formulated and a novel solution has been proposed using probability density function (PDF) shaping for both the cost function and the constraints using stochastic distribution control concept. A sufficient condition has been derived that guarantees the convergence of the optimal solution and discussions have been made for both the total probabilistic solution and chanced constrained optimization which have been well-studied in optimal power flows (OPF) area. A simple case study has been carried out for the economic dispatch of powers for a grid system when there are distributed energy resources (DERs) in the system, and encouraging results have been obtained showing that a significant savings on the generation cost can be expected.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Tuning the microstructures of decavanadate-based supramolecular hybrids via regularly changing the spacers of bis(triazole) ligands

With tuning the ligands from bte, btp, btb to bth, four new decavanadate-based metal–organic hybrid compounds, [Zn(bte)(H{sub 2}O){sub 4}][Zn{sub 2}(bte)(H{sub 2}O){sub 10}](V{sub 10}O{sub 28})·8H{sub 2}O, [Zn{sub 2}(btp){sub 4}(H{sub 2}O){sub 6}](H{sub 2}V{sub 10}O{sub 28})·4H{sub 2}O, [Zn(H{sub 2}O){sub 6}][Zn{sub 2}(btb){sub 2}V{sub 10}O{sub 28}(H{sub 2}O){sub 6}]·4H{sub 2}O, and [Zn{sub 2}(bth)(H{sub 2}O){sub 10}](H{sub 2}V{sub 10}O{sub 28})·6H{sub 2}O (bte=1,2-bis(1,2,4-triazol-1-yl)ethane, btp=1,3-bis(1,2,4-triazol-1-y1)propane, btb=1,4-bis(1,2,4-triazol-1-y1)butane, bth=1,6-bis(1,2,4-triazol-1-y1)hexane), have been synthesized under conventional conditions. The four compounds represent the first examples of decavanadate-based metal–organic hybrids constructed by Zn–bis(triazole) complexes. Their structural analyses show that the four compounds possess different Zn–bis(triazole) structural motifs and various finally structures, which verifies that regular changing the spacers of ligands is an effective strategy to tuning the structures of polyoxometalate-based hybrids. Also, the electrochemical studies show that the compounds have good electrocatalytic activities towards oxidation of nitrite molecules ascribed to V-centers. - Graphical abstract: Four compounds representing the first examples of V{sub 10}O{sub 28}-based hybrids constructed by Zn–bis(triazole) complexes have been synthesized by changing the spacers of the ligands and their electrocatalytic properties have been investigated. - Highlights: • The first examples of V{sub 10}O{sub 28}-based hybrids constructed by Zn-bis(triazole) complexes. • Verifying that changing the spacers of ligands is a strategy to tuning structures. • Showing good electrocatalytic activities toward oxidation of nitrite molecules.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗