PEP-II Status and Outlook
PEP-II/BABAR are presently in their second physics run. With machine and detector performance and reliability at an all-time high, almost 51 fb{sup -1} have been integrated by BABAR up to mid-October 2001. PEP-II luminosity has reached 4.4 x 10{sup 33} cm{sup -2} s{sup -1} and our highest monthly delivered luminosity has been above 6 pb{sup -1}, exceeding the performance parameters given in the PEP-II CDR by almost 50%. The increase compared to the first run in 2000 has been achieved by a combination of beam-current increase and beam-size decrease. In this paper we will summarize the PEP-II performance and the present limitations as well as our plans to further increase machine performance.