Impact of Temperature and Optical Error on the Combined Optical and Thermal Efficiency of Solar Tower Systems for Industrial Process Heat: Preprint

Concentrating solar thermal (CST) power towers can provide high flux concentrations at commercial scale. As a result, CST towers exhibit potential for high-temperature solar industrial process heat (SIPH) applications. However, at higher operating temperatures, thermal radiation losses can be significant. This study explores the trade-off between thermal and optical losses for SIPH applications using a collection of three case studies at operating temperatures that range from 900-1,550 degrees C. We assume blackbody radiation to represent the thermal losses at the receiver and we use ray tracing to estimate the optical losses. The results show the impact of process temperature on the maximum attainable system efficiency, as well as the higher flux concentration requirements as the temperature increases.

concentrating solar power↗

Formally Verified ZTA Requirements for OT/ICS Environments with Isabelle/HOL

The clean energy transformation includes the integration of distributed energy resources with the power grid, which has led to a substantial increase in the complexity of power grids infrastructure and the underlying operational technology environment. Power grids infrastructure represents an operational technology environment that has become a system of systems, integrating heterogeneous devices which are both software-and hardware-intensive; as a result, there are increasing demands to exploit advances in the commodity of software-hardware infrastructures to improve energy systems requirements such as cybersecurity and resilience. In such a setting, system requirements at different levels mix, which leads to vulnerabilities and undesirable outcomes. The use of formal methods to characterize and prove system requirements removes ambiguity, increases automation, and provides high levels of assurance and reliability. In this paper, we contribute a methodology and a framework for the system-level verification of zero trust architecture requirements in operational technology environments. We define a formal specification for the core functionalities of operational technology environments, the corresponding invariants, and security proofs. Of particular note is our modular approach for the formal verification of asynchronous interactions in operational technology environments. The formal specification and the proofs have been mechanized using the interactive theorem proving environment Isabelle/HOL.

formal methods↗

Equivalent Breakeven Installed Cost: A Tradeoff-Informed Measure for Technoeconomic Analysis of Candidate Heliostat Improvements

Technoeconomic analysis (TEA) is commonly used to determine economic viability of power-generating technologies, including concentrating solar power (CSP) and thermal (CST) production plants. Levelized cost of electricity (LCOE) and analogous measures provide an estimate of long-term costs for operating power plants over their designed lifetimes by accounting for revenues and costs in a time-discounted manner. While these measures are effective when assessing a technology’s total lifecycle costs and productivity under various designs, TEA of candidate incremental technology improvements from the lens of LCOE can be limited when required investment and LCOE impacts are small. In this work, we propose a novel metric for TEA of a plant component technology that recasts relative changes in levelized system costs into component-specific capital cost budgets. This measure, which we refer to as the equivalent breakeven installed cost, is the maximum budget for the technology component that leads to improved levelized costs. We illustrate the usefulness of this metric using the example of candidate heliostat improvements for a CSP tower plant. Here, the results suggest that a reduction in mirror washing costs yield a total plant O&M cost of $37/kWe-yr, which is a breakeven proposition if the average reflectance is reduced from 0.90 to 0.85 as a result of the cost savings.

Zolan, Alexander (ORCID:0000000326017604)↗

Formally Verified ZTA Requirements for OT/ICS Environments with Isabelle/HOL: Preprint

The clean energy transformation led to the integration of distributed energy resources on a top of the grid, and so a substantial increase in the complexity of power grids infrastructure and the underlying operational technology environment. Operational technology environments are becoming a system of systems, integrating heterogeneous devices which are software/hardware intensive, have ever increasing demands to exploit advances in commodity of software/hardware infrastructures, and this for good reasons - improving energy systems requirements such as cybersecurity and resilience. In such a setting, system requirements at different levels mix, thus undesirable outcomes will surely happen. The use of formal methods will remove ambiguity, increase automation and provide high levels of assurance and reliability. In this paper, we contribute a methodology and a framework for the system level verification of zero trust architecture requirements in operational technology environments. We define a formal specification for the core functionalities of operational technology environments, the corresponding invariants, and security proofs. Of particular note is our modular approach for the formal verification of asynchronous interactions in operational technology environments. The formal specification and the proofs have been mechanized using the interactive theorem proving environment Isabelle/HOL.

formal methods↗

Status Quo of Heliostat Field Deployment Processes

Deployment of the solar field of a concentrating solar power plant is one of many factors that are integral to the success of a project. Knowledge transfer from outside the industry is limited due to the unique nature of heliostats, which redirect sunlight to a receiver with high precision while maintaining a high level of reflectivity. Moreover, learning from project to project can be limited due to the site-specific nature of projects, as the market includes several developers, each with their own unique design. In this paper, we discuss the state of the art in heliostat field deployment. We cover all the key aspects of deployment from project assessment to a fully functioning system, which include site selection, layout development, supply chain, assembly, site preparation and construction, calibration, and operations and maintenance.

concentrating solar power↗

Equivalent Breakeven Installed Cost: A Tradeoff-Informed Measure for Technoeconomic Analysis of Candidate Heliostat Improvements: Preprint

Technoeconomic analysis (TEA) is commonly used to determine economic viability of power-generating technologies, including concentrating solar power (CSP) and thermal (CST) production plants. Levelized cost of electricity (LCOE) and analogous measures provide an estimate of long-term costs for operating power plants over their designed lifetimes by accounting for revenues and costs in a time-discounted manner. While these measures are effective when assessing a technology's total lifecycle costs and productivity under various designs, TEA of candidate incremental technology improvements from the lens of LCOE can be limited when required investment and LCOE impacts are small. In this work, we propose a novel metric for TEA of a plant component technology that recasts relative changes in levelized system costs into component-specific capital cost budgets. This measure, which we refer to as the equivalent breakeven installed cost, is the maximum budget for the technology component that leads to improved levelized costs. We illustrate the usefulness of this metric using the example of candidate heliostat improvements for a CSP tower plant. Here, the results suggest that a reduction in mirror washing costs yield a total plant O&M cost of $37/kWe-yr, which is a breakeven proposition if the average reflectance is reduced from 0.90 to 0.85 as a result of the cost savings.

concentrating solar power↗

Wash Vehicle Fleet Sizing for Contingency Planning Against Dust Storms

Wash vehicles containing either high- or low-pressure water sprayers, a collection of rotating brushes, or a combination of these, are frequently utilized in concentrating solar power (CSP) plants to maintain a high level of optical efficiency in the solar field. In recent years, multiple modeling approaches have been developed to obtain fleet sizes and mirror-washing schedules that optimize the tradeoff of vehicle capital and use costs and labor versus lost revenues due to soiling. These planning models cover normal operating conditions well but do not consider rare events such as dust storms which can cause a significant reduction in receiver productivity, or shut down operations until most or all of the solar field's mirrors have been cleaned. To that end, we propose a methodology that evaluates whether additional capital should be deployed to hedge against these events by weighing the net present value of the expected benefits against the capital costs. The output of this method is a breakeven frequency, a metric we sue to determine whether an additional vehicle should be purchased to address the contingency of dust storms by comparing it to the expected annual storm frequency We develop a small collection of case studies using commercial-scale CSP tower plants and obtain breakeven frequencies that mostly fall between 0.1 and 1.0 storms per year, depending on the existing fleet size and storm severity.

concentrating solar power↗

Wash Vehicle Fleet Sizing for Contingency Planning Against Dust Storms: Preprint

Wash vehicles containing either high- or low-pressure water sprayers, a collection of rotating brushes, or a combination of these, are frequently utilized in concentrating solar power (CSP) plants to maintain a high level of optical efficiency in the solar field. In recent years, multiple modeling approaches have been developed to obtain fleet sizes and mirror-washing schedules that optimize the tradeoff of vehicle capital and use costs and labor versus lost revenues due to soiling. These planning models cover normal operating conditions well but do not consider rare events such as dust storms which can a significant reduction in receiver productivity, or shut down operations until most or all of the solar field’s mirrors have been cleaned. To that end, we propose a methodology that evaluates whether additional capital should be deployed to hedge against these events by weighing the net present value of the expected benefits against the capital costs. The output of this method is a breakeven frequency, a metric we sue to determine whether an additional vehicle should be purchased to address the contingency of dust storms by comparing it to the expected annual storm frequency We develop a small collection of case studies using commercial-scale CSP tower plants and obtain breakeven frequencies that mostly fall between 0.1 and 1.0 storms per year, depending on the existing fleet size and storm severity.

41 EE - Solar Energy Technologies Office (EE-4S)↗