Search NASA⌕ Search

Engineering topics

Zvada, M.

Publications and source records attributed to Zvada, M..

The benefits and challenges of sharing glidein factory operations across nine time zones between OSG and CMS

OSG has been operating for a few years at UCSD a glideinWMS factory for several scientific communities, including CMS analysis, HCC and GLOW. This setup worked fine, but it had become a single point of failure. OSG thus recently added another instance at Indiana University, serving the same user communities. Similarly, CMS has been operating a glidein factory dedicated to reprocessing activities at Fermilab, with similar results. Recently, CMS decided to host another glidein factory at CERN, to increase the availability of the system, both for analysis, MC and reprocessing jobs. Given the large overlap between this new factory and the three factories in the US, and given that CMS represents a significant fraction of glideins going through the OSG factories, CMS and OSG formed a common operations team that operates all of the above factories. The reasoning behind this arrangement is that most operational issues stem from Grid-related problems, and are very similar for all the factory instances. Solving a problem in one instance thus very often solves the problem for all of them. This paper presents the operational experience of how we address both the social and technical issues of running multiple instances of a glideinWMS factory with operations staff spanning multiple time zones on two continents.

Sfiligoi, I.↗

CMS Distributed Computing Integration in the LHC sustained operations era

After many years of preparation the CMS computing system has reached a situation where stability in operations limits the possibility to introduce innovative features. Nevertheless it is the same need of stability and smooth operations that requires the introduction of features that were considered not strategic in the previous phases. Examples are: adequate authorization to control and prioritize the access to storage and computing resources, improved monitoring to investigate problems and identify bottlenecks on the infrastructure, increased automation to reduce the manpower needed for operations, effective process to deploy in production new releases of the software tools. We present the work of the CMS Distributed Computing Integration Activity that is responsible for providing a liaison between the CMS distributed computing infrastructure and the software providers, both internal and external to CMS. In particular we describe the introduction of new middleware features during the last 18 months as well as the requirements to Grid and Cloud software developers for the future.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗