Search NASA⌕ Search

Engineering topics

de Figueiredo, Mark

Publications and source records attributed to de Figueiredo, Mark.

CO 2 Pipeline Analysis for Existing Coal-Fired Power Plants

Previous studies have examined the needs for CO 2 transport and storage to achieve a net zero emissions economy by 2050 (Abramson and Christensen, 2021; Greig and Pascale, 2021; Chen and Pawar, 2023). This analysis examines the minimum CO 2 pipeline infrastructure necessary to transport and store CO 2 captured from coal-fired power plants. This analysis also examines an additional network configuration considering minimizing the number of state border crossings, reflecting non-economic considerations that may impact pipeline buildout.

01 COAL, LIGNITE, AND PEAT↗