@misc{indiciaeace1ed3ff2ec, title = {2019 Corrective Measures Implementation and Intermim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida}, author = {Randall K. Sillan}, year = {2020}, url = {https://ntrs.nasa.gov/citations/20205001821}, note = {Source identifier: 20205001821} }