TY - RPRT TI - Vacuum system design, construction, and operation for the Cornell High Energy Synchrotron Source upgrade AU - Lushtak, Yevgeniy AU - Burke, David AU - Li, Yulin AU - Lyndaker, Aaron AU - Liu, Xianghong AU - Ying, Laurel PY - 2021 DO - 10.1016/j.vacuum.2021.110064 UR - https://www.osti.gov/biblio/1774956 ID - 1774956 ER -