Search NASASearch

subject

design for automated manufacturing

design for automated manufacturing: explore 1 source-linked works published from 2026 to 2026, with original documents and citations.

This collection is a preview while coverage and quality are evaluated.

Search within this collection

Coverage and selection

Includes records with this source-supplied label or an explicit phrase match in their metadata. Matches indicate a mention, not proof that a paper uses a method or tests a material. Source versions are consolidated by DOI.

Sources: osti. Collection updated 2026-09-15. Counts describe this index, not the complete source archives.

Automation of Solid Oxyde Electrolyzer Cell (SOEC) & Stack Assembly

The work performed under this agreement before the No/Go decision amounted to the following: 1. Preliminary manufacturing requirements defined by business sensitivity, baseline processes & risk assessment; 2. Process & materials development, in-line gauge exploration, and preliminary automation work used to reduce risk & further refine equipment specifications; 3. “Request for Quote” issued to multiple suppliers for major equipment; 4. Application specific equipment, hardware, and fixturing will be more beneficial to fabricate inhouse; 5.Current proposals & estimates meet cycle time, capital spend, & direct labor; space is on target but requires awareness; 6. Team will continue to explore opportunities to reduce risk (dry time, traceability); 7. Go / No-Go, Purchase Orders, Equipment build & commissioning next All other future task were not completed because during the Go /No-Go decision it was confirmed this project was a "No-Go" and did not proceed past BP1; these included the following: 1. Preliminary manufacturing requirements defined by business sensitivity, baseline processes & risk assessment; 2. Process & materials development, in-line gauge exploration, and preliminary automation work used to reduce risk & further refine equipment specifications; 3. “Request for Quote” issued to multiple suppliers for major equipment; 4. Application specific equipment, hardware, and fixturing will be more beneficial to fabricate inhouse; 5. Current proposals & estimates meet cycle time, capital spend, & direct labor; space is on target but requires awareness; 6. Team will continue to explore opportunities to reduce risk (dry time, traceability) In final preparation of the termination of the Automation of Solid Oxyde Electrolyzer Cell (SOEC) & Stack Assembly, Cummins has purchased no equipment with government funds, and there is no government-owned property in Cummins possession related to this project. Minimal labor and travel were completed and paid. This acts as the Final technical report and concludes our business with DOE on this grant.

36 MATERIALS SCIENCE
Compare source metadata on this page
WorkPublishedSource identifierSource
Automation of Solid Oxyde Electrolyzer Cell (SOEC) & Stack Assembly2026-06-06Cummins-DOE-9622osti

These are bibliographic comparisons, not experimental rankings. Follow the original document for methods and conditions.