Search NASASearch

subject

Mission Design

Mission Design: explore 6 source-linked works published from 2026 to 2026, with original documents and citations.

This collection is a preview while coverage and quality are evaluated.

Search within this collection

Coverage and selection

Includes records with this source-supplied label or an explicit phrase match in their metadata. Matches indicate a mention, not proof that a paper uses a method or tests a material. Source versions are consolidated by DOI.

Sources: nasa. Collection updated 2026-09-15. Counts describe this index, not the complete source archives.

Moon Base Transportation - Deliveries to the Lunar Surface

Development of the Moon Base will enable a home away from home for astronauts who will live and work at humanity’s first lunar outpost. In this effort, NASA’s Moon Transportation Office is responsible for enabling the transformational missions required to deliver habitats, supplies, science payloads, and all other elements needed to cultivate a permanent presence on the Lunar Surface. The Mission Concept (MC) is characterized through evaluation of an end-to-end architecture that can successfully deliver a generalized heavy large-volume payload, in excess of 4000 kg, to a precision landing and touchdown on the lunar surface. The mission architecture utilizes a single launch configuration of a Lunar Lander (LL) with a unique propellant system. The LL has an integral orbital transfer capability and features jettisonable elements. The design circumvents the need for prop transfer on orbit and multiple launch configurations. The launch vehicle (LV) for this work will assume the capability to deliver a payload in excess of 40,000 kg to orbit, affording multiple LV solutions. Considerations for the LL and payload deployment from the fairing are assumed to be handled through compliance with a launch providers’ Interface Requirements Document (IRD). The MC will span from launch at Kennedy Space Center (KSC) to terminal descent and touchdown on the lunar surface, requiring a total ΔV on the order of 6 km/s beyond what is required to get the vehicle stack to a 200 km circular Low Earth Orbit (LEO). Major mission phases include: launch and launch vehicle separation, transfer operations, pre-landing navigation, and lunar descent and touchdown. A Concept of Operations (ConOps) is used as the primary design driver for defining architecture of the vehicles necessary to achieve final payload delivery. Numerous ground rules and assumptions will be provided for each phase of the mission. Concept designs for the LL is presented. An emphasis of the design maximizes a feasible path for maturation, manufacturing, and operation. A self-imposed practical consideration for this effort is the incorporation of legacy designed hardware to minimize expensive, time-intensive, and high-risk hardware development cycles. The propulsion system of the LL adopts a conventional storable bipropellant configuration of monomethyl hydrazine (MMH) and mixed oxides of nitrogen (MON3). This effort will showcase a unique propellant delivery system to minimize the reliance on propellant management devices (PMDs) during descent. Numerous key constraints have been considered, across the multiple segments of the mission. These include the unique aspects of center of gravity (CG) management, thruster plume effects including self-impingement, propulsion system hardware limitations, navigation during multiple mission phases, and landing gear geometry for uneven terrain. These constraints shape the trades necessary for precision landing of heavy cargo and ensure compatibility with broader Moon Base Transportation concepts. The resulting insights inform future transportation strategies for the Moon and beyond; directly contributing to the development of cargo‑delivery standards that will support the long‑term buildup of a sustainable, continuously inhabited Moon Base.

Lunar Habitat

A Missed Thrust Framework for Low-Thrust Spiral Trajectories to the NRHO

A framework is developed by which end-to-end optimization of many-revolution low-thrust spiral trajectories can be completed in the presence of missed thrust events. This framework is applied to the Lunar Transit trajectory by which the initial capability of NASA’s Gateway lunar space station will be delivered to a Near Rectilinear Halo Orbit. This low-thrust mission consists of three subphases, each designed according to the specific objectives and dynamical regimes encountered as the mission progresses from a medium Earth insertion orbit to cislunar space. The presented framework accounts for the unique considerations demanded by each mission phase and incorporates appropriate capabilities into a novel mission analysis tool. This methodology enables large scale and reliable analyses of missed thrust events across the end-to-end Lunar Transit to verify the robustness of flight trajectories across the full range of considered launch dates.

missed thrust

Mission Design Considerations for a Low-Thrust Spacecraft

Developing an executable low-thrust trajectory for use in a spaceflight mission requires the design and optimization of a deterministic trajectory as well as the validation that the selected architecture is robust to some set of uncertainties, execution errors, and potential contingencies. Uncertainty in the ability of the spacecraft and its launch vehicle to execute a trajectory as well as potential deviations such as in-flight anomalies combine with design-to constraints and requirements to complicate the optimization problem. The approach by which robust mission design was accomplished for the initial capability of NASA’s Gateway is presented as well as associated results.

NRHO

Mission Design Considerations for a Low-Thrust Spacecraft

Developing an executable low-thrust trajectory for use in a spaceflight mission requires the design and optimization of a deterministic trajectory as well as the validation that the selected architecture is robust to some set of uncertainties, execution errors, and potential contingencies. Uncertainty in the ability of the spacecraft and its launch vehicle to execute a trajectory as well as potential deviations such as in-flight anomalies combine with design-to constraints and requirements to complicate the optimization problem. The approach by which robust mission design was accomplished for the initial capability of NASA’s Gateway is presented as well as associated results.

mission design

GeoStorm Beacon Design Reference Mission (DRM) and Technology Drivers

A Design Reference Mission (DRM) for a NOAA Space Weather monitoring platform that provides warning times greater than 20 minutes with a 10-year operational timeline is presented. The summary of the DRM includes technology drivers for a subscale flight demonstration to reduce risk for the operational mission.

Solar Sails
Compare source metadata on this page

These are bibliographic comparisons, not experimental rankings. Follow the original document for methods and conditions.