Search NASAโŒ• Search

NASA NTRS ยท 19720003240

Experiment D016: Power tool evaluation

Abstract

Power tool evaluation was not attempted during the Gemini 11 mission because of the premature termination of the on-umbilical extravehicular activity (EVA). The experiment had been scheduled for the Gemini 8 mission, but early mission termination prevented completion of the experiment. However, the objective, equipment description, and experimental precedures are described briefly in this report.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Ettredge, V. L.. 1971-09-01. Experiment D016: Power tool evaluation. https://ntrs.nasa.gov/citations/19720003240

Cite the original work for its findings. Save a collection to share your selection of sources.