Search NASAโŒ• Search

NASA NTRS ยท 19720020267

Apollo/Saturn 5 space vehicle countdown. Volume 2: Turnaround from scrub

Abstract

The procedures required to prepare a space vehicle for subsequent launch attempt after cancelling lift-off activities are presented. The cancellation must occur after the start of cryogenic loading, but prior to initiation of ignition sequences. The sequence of operations necessary to return the space vehicle to a predetermined configuration at which time the launch count can be resumed or rescheduled for following launch opportunities is developed. The considerations and constraints that are the basis for the scrub/turnaround times are described.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1972-03-15. Apollo/Saturn 5 space vehicle countdown. Volume 2: Turnaround from scrub. https://ntrs.nasa.gov/citations/19720020267

Cite the original work for its findings. Save a collection to share your selection of sources.