NASA NTRS ยท 19720023208
Command module/service module reaction control subsystem assessment
Abstract
Detailed review of component failure histories, qualification adequacy, manufacturing flow, checkout requirements and flow, ground support equipment interfaces, subsystem interface verification, protective devices, and component design did not reveal major weaknesses in the command service module (CSM) reaction control system (RCS). No changes to the CSM RCS were recommended. The assessment reaffirmed the adequacy of the CSM RCS for future Apollo missions.
Keep this discovery
Explore connections, maps & timelines
Weary, D. P.. 1971-06-01. Command module/service module reaction control subsystem assessment. https://ntrs.nasa.gov/citations/19720023208
Cite the original work for its findings. Save a collection to share your selection of sources.