Search NASAโŒ• Search

NASA NTRS ยท 19730051286

The Space Tug mission role and program planning.

Abstract

More than half of the planned payload programs require a velocity increment beyond that nominally provided by the Space Shuttle. The reusable Space Tug system can satisfy this placement requirement and, in addition, can provide other, vital operational services for payloads in the 1980s. To realize maximum operational and economic benefits, it is desired that an orbital propulsive stage such as the Space Tug be available concurrently with Space Shuttle initial operations. Potential tug missions, significant interfaces, system characteristics, and configuration alternatives are discussed in conjunction with salient program planning factors.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Schnyer, A. D.. 1973-07-01. The Space Tug mission role and program planning.. https://ntrs.nasa.gov/citations/19730051286

Cite the original work for its findings. Save a collection to share your selection of sources.