NASA NTRS ยท 19750011207
Spacelab user implementation assessment study. Volume 1: Concept development and evaluation
Abstract
The total matrix of alternate Spacelab processing concepts and the rejection rationale utilized to reduce the matrix of 243 alternates to the final candidate processing concepts are developed. The work breakdown structure used for the systematic estimation and compilation of integration and checkout resources is presented along with descriptors of each element. Program models are provided of the space transportation system, the Spacelab, the orbiter, and the ATL that were used as the basis for the study trades, analyses, and optimizations. Resource requirements for all processing concepts are summarized along with the optimizations of the processing concepts. Concept evaluations including flight-rate sensitivities of the GSE, facilities, Spacelab hardware elements, and personnel are delineated. An analysis is presented of the applicability of the candidate concepts to potential spacelab users. The impact of the use of the western test range as an orbiter/spacelab launch site on the candidate processing concepts is evaluated. An assessment of the geographical co-location of experiment, Spacelab, and orbiter-cargo integration is included. Ownership options of the support module/system igloo are discussed.
Keep this discovery
Explore connections, maps & timelines
1975-02-01. Spacelab user implementation assessment study. Volume 1: Concept development and evaluation. https://ntrs.nasa.gov/citations/19750011207
Cite the original work for its findings. Save a collection to share your selection of sources.