NASA NTRS · 19760007063
PPP/nonreal-time trajectory program interface requirements and capabilities
Abstract
The selection process for interfacing a nonreal time trajectory program with the procedures and performance program is outlined; the interface provides summary data timelines for any desired trajectory profile. Consideration was given to two separate digital programs for satisfying capabilities. One was the CDC 6400 digital program BANDITO, and the second was the UNIVAC 1110 SVDS program.
Keep this discovery
Explore connections, maps & timelines
Mcgavern, J. L., Arbet, J. D.. 1975-11-28. PPP/nonreal-time trajectory program interface requirements and capabilities. https://ntrs.nasa.gov/citations/19760007063
Cite the original work for its findings. Save a collection to share your selection of sources.