Search NASAโŒ• Search

NASA NTRS ยท 19770008132

Payload specialist station study. Volume 3: Program study cost estimates. Part 1: Work breakdown structure

Abstract

The work breakdown structure (WBS) for the Payload Specialist Station (PSS) is presented. The WBS is divided into two elements--PSS contractor and mission unique requirements. In accordance with the study ground rules, it is assumed that a single contractor, hereafter referred to as PSS Contractor will perform the following: (1) provide C and D hardware (MFDS and elements of MMSE), except for GFE; (2) identify software requirements; (3) provide GSE and ground test software; and (4) perform systems engineering and integration in support of the Aft Flight Deck (AFD) C and D concept. The PSS Contractor WBS element encompasses a core or standardized PSS concept. Payload peculiar C and D requirements identified by users will originate as a part of the WBS element mission unique requirements; these requirements will be provided to the PSS Contractor for implementation.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1976-11-06. Payload specialist station study. Volume 3: Program study cost estimates. Part 1: Work breakdown structure. https://ntrs.nasa.gov/citations/19770008132

Cite the original work for its findings. Save a collection to share your selection of sources.