Search NASA⌕ Search

NASA NTRS · 19770032330

An earth and ocean SAR for Space Shuttle - User requirements and data handling implications

Abstract

A brief summary is presented of user requirements for the Shuttle synthetic aperture radar (SAR) to be flown on a sortie mission of 7 to 10 days in duration, based on information collected from survey of the literature and direct user contacts. This information suggests selection of a dual frequency (L and X band) dual polarization SAR capable of meeting most user requirements. Particular attention is given to the SAR system specifications and the data handling capability expected to be available during the 1980s for the tracking and data relay satellite system (TDRSS). The data link requirements of the majority of Shuttle experiments will eventually determine whether the necessary high-capacity Shuttle-TDRSS return link will be part of the intrinsic Shuttle capability or will be part of the SAR payload.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Cohen, E. A., Mehlis, J. G., Jordan, R. L., Brown, W. E., Jr., Rouse, J. W., Jr.. 1975-01-01. An earth and ocean SAR for Space Shuttle - User requirements and data handling implications. https://ntrs.nasa.gov/citations/19770032330

Cite the original work for its findings. Save a collection to share your selection of sources.