NASA NTRS · 19770058716
Satellite power system LEO vs GEO assembly issues
Abstract
A strawman crystal-silicon 5-GW Satellite Power System (SPS) concept formed the basis of a study of construction concepts for building a complete SPS in low earth orbit (LEO) or geosynchronous orbit (GEO). Construction scenarios were evolved, including factory-in-space concepts and operations. Design implications imposed on the SPS satellite as a consequence of in-orbit assembly operations, and related attitude control requirements during assembly in LEO or GEO environments, were also evaluated. Results are presented indicating that complete assembly of an operational SPS in LEO, followed by transport to GEO, does not appear technically desirable. The best mix, however, of LEO versus GEO construction activity remains to be resolved.
Keep this discovery
Explore connections, maps & timelines
Mockovciak, J., Jr., Adornato, R. J.. 1977-01-01. Satellite power system LEO vs GEO assembly issues. https://ntrs.nasa.gov/citations/19770058716
Cite the original work for its findings. Save a collection to share your selection of sources.