NASA NTRS ยท 19770066055
Space construction base operations in support of solar power satellite development
Abstract
Development of the Solar Power Satellite (SPS) system for initial operation in the late 1990's requires substantial orbital development activities in the mid-1980's leading to a key system development decision in about 1987. A manned Space Construction Base (SCB) in low-earth orbit is needed to support the SPS orbital development program. The SPS system development issues are defined, along with a candidate development program for resolving these issues. The development hardware systems of interest for the mid-1980's include: (1) a tapered linear array microwave antenna (123 x 125.6 m 'cross') with a 57-kW/rf amplitron output, which is SCB constructed and operated in low-earth orbit initially, and, subsequently, unmanned in geosynchronous earth orbit; and (2) a SCB-constructed and -operated 9 x 14.4 m planar array antenna (358 kW/rf/) powered by a 455-kWe silicon photovoltaic solar collector.
Keep this discovery
Explore connections, maps & timelines
Mckhann, G. G.. 1977-01-01. Space construction base operations in support of solar power satellite development. https://ntrs.nasa.gov/citations/19770066055
Cite the original work for its findings. Save a collection to share your selection of sources.