NASA NTRS ยท 19780021198
Quick look test report: MPT static firing no. 2 test MPT-S2
Abstract
The three engine cluster was fired at 70 percent power level for a nominal 15 seconds to evaluate the integrated performance of the main propulsion system. Engine ignition occurred at approximately 1403 with the planned mainstage duration achieved for all three engines. Operation of all systems was as expected with the exception of the recirculation pumps. The pumps were started while the propellant loading was in fast fill, but they cavitated and lost head at the termination of fast fill. The pumps were subsequently restarted after pressurizing the tank and draining back propellant to get good quality. Post test inspection of the engines revealed some discoloration on the inside of the thrust chamber and distorted drain lines for engine #2.
Keep this discovery
Explore connections, maps & timelines
1978-06-12. Quick look test report: MPT static firing no. 2 test MPT-S2. https://ntrs.nasa.gov/citations/19780021198
Cite the original work for its findings. Save a collection to share your selection of sources.