Search NASAโŒ• Search

NASA NTRS ยท 19790006954

OAST Space Theme Workshop. Volume 3: Working group summary. 6: Power (P-2). A. Statement. B. Technology needs (form 1). C. Priority assessment (form 2)

Abstract

Power requirements for the multipurpose space power platform, for space industrialization, SETI, the solar system exploration facility, and for global services are assessed for various launch dates. Priorities and initiatives for the development of elements of space power systems are described for systems using light power input (solar energy source) or thermal power input, (solar, chemical, nuclear, radioisotopes, reactors). Systems for power conversion, power processing, distribution and control are likewise examined.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1976-01-01. OAST Space Theme Workshop. Volume 3: Working group summary. 6: Power (P-2). A. Statement. B. Technology needs (form 1). C. Priority assessment (form 2). https://ntrs.nasa.gov/citations/19790006954

Cite the original work for its findings. Save a collection to share your selection of sources.