NASA NTRS ยท 19800021325
Seasat. Volume 3: Ground systems
Abstract
The Seasat Project was a feasibility demonstration of the use of orbital remote sensing for global ocean observation. The satellite was launched in June of 1978 and was operated successfully until October 1978. A massive electrical failure occurred in the power system, terminating the mission prematurely. The ground systems using during the mission life are discussed. Descriptions of the operating organization, the system elements, and the testing program are included. The various phases of the mission: launch and orbit insertion; cruise; and calibration are discussed. A special section is included on the orbit maneuver activites. Operations during the satellite failure are reviewed and summarized.
Keep this discovery
Explore connections, maps & timelines
Pounder, E.. 1980-06-15. Seasat. Volume 3: Ground systems. https://ntrs.nasa.gov/citations/19800021325
Cite the original work for its findings. Save a collection to share your selection of sources.