Search NASAโŒ• Search

NASA NTRS ยท 19800021828

Pioneers 6 through 9 support

Abstract

The cruise phases of Pioneer 6 through 9 missions and the operations of the Deep Space Network in supoort of the Pioneer missions are reported for the period of 16 December 1979 through 31 May 1980. Pioneer 6 through 9 are in cruise mode and spacecraft appear to be operating nominally. Pioneer 8 continues to require the 100 kW transmitter from 64 m stations due to the spacecraft's degraded receiver. Difficulties in acquiring a downlink from the Pioneer 6 are discussed.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Nevarez, R. E.. 1980-08-15. Pioneers 6 through 9 support. https://ntrs.nasa.gov/citations/19800021828

Cite the original work for its findings. Save a collection to share your selection of sources.