Fracture control plan for propellant and pressurant tanks

Abstract

To assure the functional integrity of the GLL-RPM fuel and pressurized gas tank, all activities during entire lifetime of the tank, from manufacture to the end of the mission, must be monitored. Specifications are given for all procedures which influence the tank structure including design, manufacture, cleaning, test operations, and storage. Tests to be conducted to demonstrate that requirements of the fracture control plan are satisfied include static tests, cyclic load tests, proof tests, He-leak test, and acceptance tests.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1981-02-01. Fracture control plan for propellant and pressurant tanks. https://ntrs.nasa.gov/citations/19810010961