NASA NTRS ยท 19810012012
Monitoring and control requirement definition study for Dispersed Storage and Generation (DSG). Volume 4, appendix C: Identification from utility visits of present and future approaches to integration of DSG into distribution networks
Abstract
Visits to four utilities concerned with the use of DSG power sources on their distribution networks yielded useful impressions of present and future approaches to the integration of DSGs into electrical distribution network. Different approaches to future utility systems with DSG are beginning to take shape. The new DSG sources will be in decentralized locations with some measure of centralized control. The utilities have yet to establish firmly the communication and control means or their organization. For the present, the means for integrating the DSGs and their associated monitoring and control equipment into a unified system have not been decided.
Keep this discovery
Explore connections, maps & timelines
1980-10-01. Monitoring and control requirement definition study for Dispersed Storage and Generation (DSG). Volume 4, appendix C: Identification from utility visits of present and future approaches to integration of DSG into distribution networks. https://ntrs.nasa.gov/citations/19810012012
Cite the original work for its findings. Save a collection to share your selection of sources.