NASA NTRS ยท 19810023060
Fabrication and testing of a prototype longwall face alignment system
Abstract
Fabrication and testing of a laser system for instantaneous location of a longwall shearer are summarized. Calculations and measurements for the design of a laser based system for monitoring and controlling the trajectory of the shearing machine as it progresses along the longwall face are reported. An early version was fabricated by employing simple mechanical contrivances and a standard miners lamp. It is concluded that the advantages of the early version is the ability to test the longwall face without approval from the Mine Safety and Health Administration.
Keep this discovery
Explore connections, maps & timelines
1981-01-01. Fabrication and testing of a prototype longwall face alignment system. https://ntrs.nasa.gov/citations/19810023060
Cite the original work for its findings. Save a collection to share your selection of sources.