NASA NTRS ยท 19820002416
Integrated command, control communication and computation system study
Abstract
The study was conducted in three phases: a functional requirements phase; a functional architecture phase; and a design plan phase. The major emphasis was on the functional architecture phase and the approaches used for its functional hierarchy, operations concept, and interfaces.
Keep this discovery
Explore connections, maps & timelines
1981-08-01. Integrated command, control communication and computation system study. https://ntrs.nasa.gov/citations/19820002416
Cite the original work for its findings. Save a collection to share your selection of sources.