NASA NTRS ยท 19820008609
Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development
Abstract
A schematic and physical layout is given for the 5kW integrated system and the development status of individual components is described. The results of using a one dimensional mathematical model of the 5kW reformer are presented. Plans for a single-tube reformer test unit for the acquisition of temperature profile data are described. Tentative specifications for a 50kW dc-to-ac inverter are listed. Performance data are given on two 3-cell stacks incorporating semiautomatic acid replenishment systems and improved electrocatalysts. A qualification test on methanol/steam reforming catalyst T2107RS is reported, including a portion in which the catalyst was deliberately poisoned with 800 ppm ethanol in the feed.
Keep this discovery
Explore connections, maps & timelines
1981-08-25. Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development. https://ntrs.nasa.gov/citations/19820008609
Cite the original work for its findings. Save a collection to share your selection of sources.