Search NASAโŒ• Search

NASA NTRS ยท 19820014780

Salton Sea Project, Phase 1

Abstract

A feasibility study was made for a salt gradient solar pond power plant in or near the Salton Sea of California. The conclusions support continuance 5-MWe proof-of-concept experiment, and ultimate construction by an electric utility company of a 600-MWe plant. The Solar Pond concept would be an environmental benefit to the Salton Sea by reversing the increasing salinity trend. The greatest cost drivers are the lake dike construction and pond sealing. Problems to be resolved include method of brine production from Salton Sea water for the first unit (which requires evaporation pond area and time), the high turbidity and color content of the Salton Sea water (which requires pretreatment), and other questions related to pond permeability, bio-activity and soil/brine chemical reactions. All technical and environmental problems appear solvable and/or manageable if care is taken in mitigating impacts.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Peelgren, M. L.. 1982-01-15. Salton Sea Project, Phase 1. https://ntrs.nasa.gov/citations/19820014780

Cite the original work for its findings. Save a collection to share your selection of sources.