NASA NTRS ยท 19820019474
Satellite services system analysis study. Volume 5: Programmatics
Abstract
The overall program and resources needed for development and operation of a Satellite Services System is reviewed. Program requirements covered system operations through 1993 and were completed in preliminary form. Program requirements were refined based on equipment preliminary design and analysis. Schedules, costs, equipment utilization, and facility/advanced technology requirements were included in the update. Equipment user charges were developed for each piece of equipment and for representative satellite servicing missions.
Keep this discovery
Explore connections, maps & timelines
1981-08-01. Satellite services system analysis study. Volume 5: Programmatics. https://ntrs.nasa.gov/citations/19820019474
Cite the original work for its findings. Save a collection to share your selection of sources.