Search NASAโŒ• Search

NASA NTRS ยท 19850005531

Oral presentation of first year final report, appendix A

Abstract

Plans for self contained in-house capability to test Large Space Structures (LSS) and their control prior to flight are presented. A ground test facility which demonstrates and validates LSS control theory is defined. An experiment is designed which assures a high success rate for flight test. A strapdown algorithm is developed. Research on the astromast is reported, as is the development of an overall system model.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1984-11-01. Oral presentation of first year final report, appendix A. https://ntrs.nasa.gov/citations/19850005531

Cite the original work for its findings. Save a collection to share your selection of sources.