Space platform expendables resupply concept definition study. Volume 3: Work breakdown structure and work breakdown structure dictionary

Abstract

The work breakdown structure (WBS) for the Space Platform Expendables Resupply Concept Definition Study is described. The WBS consists of a list of WBS elements, a dictionary of element definitions, and an element logic diagram. The list and logic diagram identify the interrelationships of the elements. The dictionary defines the types of work that may be represented by or be classified under each specific element. The Space Platform Expendable Resupply WBS was selected mainly to support the program planning, scheduling, and costing performed in the programmatics task (task 3). The WBS is neither a statement-of-work nor a work authorization document. Rather, it is a framework around which to define requirements, plan effort, assign responsibilities, allocate and control resources, and report progress, expenditures, technical performance, and schedule performance. The WBS element definitions are independent of make-or-buy decisions, organizational structure, and activity locations unless exceptions are specifically stated.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1984-12-01. Space platform expendables resupply concept definition study. Volume 3: Work breakdown structure and work breakdown structure dictionary. https://ntrs.nasa.gov/citations/19860015264

Cite the original work for its findings. Save a collection to share your selection of sources.